in 
   



 
Cover Image
 

NECA 200:2010
Recommended Practice For Installing And Maintaining Temporary Electric Power At Construction Sites


Be notified when this Standard is updated or amended - Add to StandardsWatch

General Product Information

Document Type Standard
Status Current
Publisher:    National Electrical Contractors Association
Supersedes:
NECA 200:2002



Available Products          My Location  :
Product availability, format and price varies from country to country. Please Login/register.
Order   Format Device Compatibility Price [USD]
Preferred Currency

   

Add To Cart

Hardcopy
--  
$52.00
Delivery Time:   3-5 days
Pages: 21

Table of Contents

Foreword
1. Scope
2. Temporary Construction Power
3. Responsibilities
4. Planning the Installation
5. Load Estimate
6. Power Source Selection
7. Distribution System Layout
8. Grounding and Bonding
9. Equipment Installation and Protection
10. Ground-Fault Circuit Interrupter (GFCI) Protection for
 Personnel
11. Wiring Methods
12. Receptacles
13. Temporary Lighting
14. System Maintenance
15. System Removal
Annex A: Plug and Receptacle Configurations (NEMA Standard 
 WD 6-2002)
Annex B: OSHA 29 CFT 1926.56: Minimum Light Levels for 
 Construction Work
Annex C: Reference Standards

Abstract

Specifies installation procedures at construction sites for temporary power operating at voltages of 600 volts or less.

History

2010 [01/01/0001]
2002 [09/09/2002]

Tell a friend about this search result             

Suggestions