Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

09/30210287 DC : 0

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

BS EN 60086-1 ED11 - PRIMARY BATTERIES - PART 1: GENERAL

Available format(s)

Hardcopy , PDF

Superseded date

31-07-2011

Language(s)

English

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Requirements
  4.1 General
      4.1.1 Design
      4.1.2 Battery dimensions
      4.1.3 Terminals
      4.1.4 Classification (electrochemical system)
      4.1.5 Designation
      4.1.6 Marking
      4.1.7 Interchangeability: battery voltage
  4.2 Performance
      4.2.1 Discharge performance
      4.2.2 Dimensional stability
      4.2.3 Leakage
      4.2.4 Open-circuit voltage limits
      4.2.5 Service output
      4.2.6 Safety
5 Performance - Testing
  5.1 General
  5.2 Discharge testing
      5.2.1 Application tests
      5.2.2 Service output tests
  5.3 Conformance check to a specified minimum
      average duration
  5.4 Calculation method of the specified value of
      minimum average duration
  5.5 OCV testing
  5.6 Battery dimensions
  5.7 Leakage and deformation
6 Performance - Test conditions
  6.1 Pre-discharge conditioning
  6.2 Commencement of discharge tests after storage
  6.3 Discharge test conditions
  6.4 Load resistance
  6.5 Time periods
  6.6 Test condition tolerances
  6.7 Activation of 'P'-system batteries
  6.8 Measuring equipment
      6.8.1 Voltage measurement
      6.8.2 Mechanical measurement
7 Sampling and quality assurance
  7.1 Sampling
      7.1.1 Testing by attributes
      7.1.2 Testing by variables
  7.2 Product quality indices
      7.2.1 Capability index (c[p])
      7.2.2 Capability index (c[pk])
      7.2.3 Performance index (p[p])
      7.2.4 Performance index (p[pk])
8 Battery packaging
Annex A (normative) - Guidelines for the standardization
        of batteries
Annex B (normative) - Equipment design
Annex C (normative) - Designation system (nomenclature)
Annex D (normative) - Calculation method for the specified
        value of minimum average duration
Annex E (normative) - Code of practice for packaging,
        shipment, storage, use and disposal of primary
        batteries
Annex F (informative) - Standard discharge voltage U[s] -
        Definition and method of determination
Annex G (informative) - Preparation of standard methods
        of measuring performance (SMMP) of consumer goods
Bibliography

BS EN 60086-1 ED11

Committee
CPL/35
DocumentType
Draft
Pages
50
PublisherName
British Standards Institution
Status
Superseded
SupersededBy

IEC 60050-482:2004 International Electrotechnical Vocabulary (IEV) - Part 482: Primary and secondary cells and batteries
IEC 60410:1973 Sampling plans and procedures for inspection by attributes
IEC 60086-2:2015 Primary batteries - Part 2: Physical and electrical specifications
IEC 60086-5:2016 Primary batteries - Part 5: Safety of batteries with aqueous electrolyte
IEC 60086-4:2014 Primary batteries - Part 4: Safety of lithium batteries
IEC 60086-3:2016 Primary batteries - Part 3: Watch batteries

View more information
$39.22
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more