15/30303461 DC : 0
Current
The latest, up-to-date edition.
BS EN 16907-5 - EARTHWORKS - PART 5: QUALITY CONTROL
Hardcopy , PDF
English
European foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Quality Assurance Programme
5 Quality Control Plan
6 Material checking
7 Approaches to Compaction Control
8 Compliance testing
9 Frequency of testing
10 Evaluation of test results
11 Records to be kept during construction
12 Embankment construction monitoring
Annex A (informative) - Methods of evaluation
of test results
Annex B (informative) - Specification of compaction
requirements using the Q/S method
Bibliography
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.