Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

98/106709 DC : DRAFT AUG 98

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

PREN 12566-3 - SMALL WASTE-WATER TREATMENT SYSTEMS UP TO 50 PT - PART 3: PACKAGED AND/OR SITE ASSEMBLED DOMESTIC WASTE-WATER TREATMENT PLANTS

Superseded date

25-09-2001

Published date

23-11-2012

1 SCOPE
2 NORMATIVE REFERENCES
3 DEFINITIONS AND TERMINOLOGY
4 CLASSIFICATION
5 SPECIFICATIONS
   5.1 DIMENSIONS
        5.1.1 Inlets, outlets and connections
        5.1.2 Access
        5.1.3 Design basis
   5.2 CONSTRUCTION
   5.3 TREATMENT CAPACITY
   5.4 WATERTIGHTNESS
   5.5 STRUCTURAL REQUIREMENTS
       5.5.1 General
       5.5.2 Backfill load
       5.5.3 Hydrostatic loads
       5.5.4 Dynamic loads
   5.6 DURABILITY
6 TEST METHODS
   6.1 TREATMENT CAPACITY TESTING PROCEDURE
   6.2 STRUCTURAL LOAD BEARING CAPACITY
   6.3 WATERTIGHTNESS
7 MARKING
8 QUALITY CONTROL
   8.1 EVALUATION OF CONFORMITY
       8.1.1 General
       8.1.2 Initial type tests
   8.2 FACTORY PRODUCTION CONTROL
       8.2.1 Raw materials and components
       8.2.2 Production process
       8.2.3 Finished product testing
       8.2.4 Stock control
9 INSTALLATION INSTRUCTIONS
10 OPERATING AND MAINTENANCE INSTRUCTIONS
ANNEX A (NORMATIVE): WATERTIGHTNESS TEST
      A.1 WATER TEST
          A.1.1 Procedure
          A.1.2 Expression of results
      A.2 Air permeability vacuum test
          A.2.1 Sample
          A.2.2 Procedure
          A.2.3 Expression of results
      A.3 Pneumatic pressure test
          A.3.1 Procedure
          A.3.2 Expression of results
ANNEX B (NORMATIVE): TREATMENT CAPACITY PROCEDURE
      B.1 Testing Locations
      B.2 Plant selection and preliminary evaluation
          B.2.1 General
          B.2.2 Installation and commissioning
          B.2.3 Operation and maintenance procedures during
                testing
          B.2.4 Data to be monitored
      B.3 Testing Procedure at a Test Centre
          B.3.1 Time for establishment
          B.3.2 Influents characteristics
          B.3.3 Daily flow pattern for testing
          B.3.4 Timetable for test procedure
          B.3.5 Plant loading
          B.3.6 Stress tests
          B.3.7 Sampling
      B.4 Test procedure for user site
          B.4.1 Site Selection
          B.4.2 Time for establishment
          B.4.3 Timetable for test procedure at User Site
          B.4.4 The Holiday and Power Breakdown Stress Tests
          B.4.5 Bath water discharge test
          B.4.6 Sampling
      B.5 Sample analysis
      B.6 TREATMENT CAPACITY REQUIREMENTS
      B.7 TEST REPORT
      B.8 DESIGN CHANGES

Committee
B/505/40
DocumentType
Draft
PublisherName
British Standards Institution
Status
Superseded
SupersededBy

Standards Relationship
PREN 12566-3 : DRAFT 2015 Identical

EN 476:2011 General requirements for components used in drains and sewers
EN 1085:2007 Wastewater treatment - Vocabulary

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more