Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

API TR 17TR5 : 2012

Current

Current

The latest, up-to-date edition.

AVOIDANCE OF BLOCKAGES IN SUBSEA PRODUCTION CONTROL AND CHEMICAL INJECTION SYSTEMS

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

14-03-2012

1 Scope
2 Normative References
3 Terms, Definitions, and Abbreviations
4 Overview
5 Subsea Production System
6 Quality, Health, Safety, and Environment (QHS&E)
7 Design
8 Fluid Manufacture
9 Preservation, Storage, and Handling
10 Operations
11 Remediation
12 Supplier Data
Annex A (informative) - Typical Subsea Production System
Annex B (normative) - Indicative Physical Properties and
        Dose Rate of Production Chemical Fluids
Annex C (normative) - Chemical Injection System Design
        Flowchart - New Development
Annex D (normative) - Chemical Injection System Design
        Flowchart - Fluid Change Out
Annex E (normative) - Subsea Chemical Injection
        System - Responsibilities Matrix
Annex F (normative) - Typical Functional Line
        Diagram - Chemical Injection System
Annex G (normative) - Typical Chemical Injection System
        Wetted Materials Listing
Annex H (normative) - SPS Blockage - Diagnostic Checklist
        and Potential Remedial Actions

Discusses the avoidance of blockages in subsea production control and chemical injection systems (CISs).

DocumentType
Standard
Pages
54
ProductNote
This product is unavailable in Cuba, Iran, North Korea, Syria
PublisherName
American Petroleum Institute
Status
Current

API TR 17TR8 : 2018 HIGH-PRESSURE HIGH-TEMPERATURE DESIGN GUIDELINES

ISO 13628-1:2005 Petroleum and natural gas industries — Design and operation of subsea production systems — Part 1: General requirements and recommendations
API 17F : 2014 SUBSEA PRODUCTION CONTROL SYSTEMS
ISO 13628-7:2005 Petroleum and natural gas industries — Design and operation of subsea production systems — Part 7: Completion/workover riser systems
ISO 13628-6:2006 Petroleum and natural gas industries Design and operation of subsea production systems Part 6: Subsea production control systems
ISO 13628-4:2010 Petroleum and natural gas industries — Design and operation of subsea production systems — Part 4: Subsea wellhead and tree equipment
ISO 11014:2009 Safety data sheet for chemical products Content and order of sections
API SPEC 17E : 2017 SPECIFICATION FOR SUBSEA UMBILICALS
SAE AS 4059F : 2013 AEROSPACE FLUID POWER - CONTAMINATION CLASSIFICATION FOR HYDRAULIC FLUIDS
ISO 20815:2008 Petroleum, petrochemical and natural gas industries Production assurance and reliability management
ISO 13628-5:2009 Petroleum and natural gas industries Design and operation of subsea production systems Part 5: Subsea umbilicals
API RP 17N : 2017 RECOMMENDED PRACTICE ON SUBSEA PRODUCTION SYSTEM RELIABILITY, TECHNICAL RISK, AND INTEGRITY MANAGEMENT
API 17D : 2011 DESIGN AND OPERATION OF SUBSEA PRODUCTION SYSTEMS - SUBSEA WELLHEAD AND TREE EQUIPMENT
ISO 4407:2002 Hydraulic fluid power — Fluid contamination — Determination of particulate contamination by the counting method using an optical microscope

View more information
$180.06
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more