ARMP-4 : 2008
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
GUIDANCE FOR WRITING NATO R & M REQUIREMENTS DOCUMENTS
Hardcopy , PDF
14-08-2014
English
01-01-2008
CHAPTER 1 - INTRODUCTION
101 GENERAL
102 PURPOSE
103 APPLICABILITY
104 RELATED DOCUMENTS
CHAPTER 2 - CONCEPTS AND FACTORS
201 GENERAL
202 IMPORTANCE OF USING QUANTITATIVE R&M REQUIREMENTS
203 NEED FOR TRACEABILITY
204 CONFIDENCE STATEMENTS
205 SELECTION OF R&M PARAMETERS
A GENERAL
B SYSTEM/EQUIPMENT R & M PARAMETERS
B.1 Availability
B.2 Mission Success
B.3 Maintenance Manpower
B.4 Logistic Support Cost
C SPECIFYING R&M REQUIREMENTS
C.1 Reliability
C.2 Maintainability
C.3 Combat Resilience
C.4 Testability
206 DUTY CYCLES AND ENVIRONMENTAL ENVELOPE
A DUTY CYCLES
B THE ENVIRONMENTAL ENVELOPE
207 MAINTENANCE CONCEPT
208 DEFINITIONS OF FAULT AND FAILURE
209 SOURCES OF INFORMATION
A OPERATIONAL INFORMATION
B MAINTENANCE PLANNING INFORMATION
210 SAFETY AND ASSOCIATED RISK ANALYSIS
211 R & M PROGRAMME PLANS
CHAPTER 3 - DEVELOPMENT OF THE R&M CONTENT OF THE
PHASE ARMAMENTS PROGRAMMING SYSTEM (PASS)
MILESTONES
301 GENERAL
302 THE R & M CONTENT OF THE NATO STAFF TARGET
A PRE-FEASIBILITY STUDIES
B FORMULATION OF THE R & M CONTENT OF THE STAFF
TARGET
303 THE R&M CONTENT OF THE NATO STAFF REQUIREMENT
A FEASIBILITY STUDIES
B FORMULATION OF THE R&M CONTENT OF THE NATO
STAFF REQUIREMENT
304 THE R&M CONTENT OF THE NATO DESIGN &
DEVELOPMENT OBJECTIVE AND THE DESIGN &
DEVELOPMENT SPECIFICATION
A PROJECT DEFINITION PHASE
B FORMULATION OF THE R&M CONTENT OF THE NATO
DESIGN & DEVELOPMENT OBJECTIVE AND THE DESIGN
& DEVELOPMENT SPECIFICATION
305 THE R&M CONTENT OF THE NATO PRODUCTION OBJECTIVE
AND THE PRODUCTION SPECIFICATION
A DESIGN & DEVELOPMENT PHASE
B FORMULATION OF THE R&M CONTENT OF THE NATO
PRODUCTION OBJECTIVE AND THE PRODUCTION
SPECIFICATION
306 THE R & M CONTENT OF THE NATO IN-SERVICE GOALS
A PRODUCTION PHASE
B FORMULATION OF THE R&M CONTENT OF THE NATO
IN-SERVICE GOALS
C IN-SERVICE PHASE
D R & M CHARACTERISTICS AND IMPACT ON THE
MAINTENANCE PLAN
ANNEX A - EXAMPLES OF QUANTITATIVE R&M REQUIREMENTS
ANNEX B - QUANTIFYING MAINTAINABILITY REQUIREMENTS
APPENDIX - MATHEMATICAL BACKGROUND TO THE LOG-NORMAL
DISTRIBUTION
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.