AWS C2.21M/C2.21 : 2015
Current
The latest, up-to-date edition.
SPECIFICATION FOR THERMAL SPRAY EQUIPMENT PERFORMANCE VERIFICATION
01-01-2015
Personnel
Foreword
List of Tables
1. General Requirements
2. Normative References
3. Terms and Definitions
4. Performance Verification Procedure
5. Inspection Activities
6. Process Controls
7. Process-Specific Considerations
8. Reporting
Annex A (Informative) - Useful Gas Flow Calculations
Annex B (Informative) - Liquid Properties
Annex C (Informative) - Informative References
Annex D (Informative) - Guidelines for Preparation of
Technical Inquires for AWS Technical Committees
List of AWS Documents on Thermal Spraying
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.