Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

BS EN 50123-5:2003

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

Railway applications. Fixed installations. D.C. switchgear Surge arresters and low-voltage limiters for specific use in d.c. systems

Available format(s)

Hardcopy , PDF

Superseded date

31-01-2012

Language(s)

English

Published date

11-07-2003

Introduction
1 Common matters
  1.1 Scope
  1.2 Normative references
2 Non-linear resistor type gapped surge arresters
  2.1 General
  2.2 Definitions
  2.3 Marking
  2.4 Preferred ratings
  2.5 Requirements
  2.6 General testing procedure
  2.7 Routine and acceptance tests
  2.8 Type tests
3 Artificial pollution testing of surge arresters
4 Metal-oxide surge arresters without gaps
  4.1 General
  4.2 Definitions
  4.3 Marking
  4.4 Preferred ratings
  4.5 Requirements
  4.6 General testing procedure
  4.7 Type tests
  4.8 Routine and acceptance tests
5 Low-voltage limiters for specific use in d.c. systems
  5.1 General
  5.2 Definitions
  5.3 Marking and classification
  5.4 Preferred ratings
  5.5 Requirements
  5.6 Routine and acceptance tests
  5.7 Type tests
Annex A (informative) Typical information given with
        enquiries and tenders valid for all types
        covered in this European Standard
Annex B (informative) High voltage filters for protection
        against voltage surges
Figures
Tables

Specifies particular requirements for surge arresters for specific use in fixed installations of d.c. traction systems.

Committee
GEL/9
DevelopmentNote
Supersedes 01/206789 DC To be read in conjunction with BS EN 50123-1, BS EN 60099-1 & BS EN 60099-4. (07/2003) Supersedes 94/216282 DC. (03/2007)
DocumentType
Standard
Pages
38
PublisherName
British Standards Institution
Status
Superseded
SupersededBy
Supersedes

Standards Relationship
NF EN 50123-5 : 2004 Identical
UNE-EN 50123-5:2004 Identical
NBN EN 50123-5 : 2003 Identical
NEN EN 50123-5 : 2003 Identical
I.S. EN 50123-5:2003 Identical
SN EN 50123-5 : 2003 Identical
EN 50123-5:2003 Identical
DIN EN 50123-5 : 2003 Identical

IEC 60255-21-2:1988 Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section Two: Shock and bump tests
IEC 60255-22-1:2007 Measuring relays and protection equipment - Part 22-1: Electrical disturbance tests - 1 MHz burst immunity tests
EN 60688:2013 Electrical measuring transducers for converting A.C. and D.C. electrical quantities to analogue or digital signals
EN 60255-23:1996 Electrical relays - Part 23: Contact performance
IEC 60099-4:2014 Surge arresters - Part 4: Metal-oxide surge arresters without gaps for a.c. systems
EN 50123-1:2003 Railway applications - Fixed installations - D.C. switchgear - Part 1: General
IEC 60688:2012 Electrical measuring transducers for converting A.C. and D.C. electrical quantities to analogue or digital signals
IEC 60870-2-1:1995 Telecontrol equipment and systems - Part 2: Operating conditions - Section 1: Power supply and electromagnetic compatibility
EN 60099-4:2014 Surge arresters - Part 4: Metal-oxide surge arresters without gaps for a.c. systems
EN 61733-1:1996 Measuring relays and protection equipment - Protection communication interfacing - Part 1: General
EN 60099-1:1994/A1:1999 SURGE ARRESTERS - PART 1: NON-LINEAR RESISTOR TYPE GAPPED SURGE ARRESTERS FOR A.C. SYSTEMS
EN 60255-6 : 94 AC 95 ELECTRICAL RELAYS - MEASURING RELAYS AND PROTECTION EQUIPMENT
IEC 61733-1:1995 Measuring relays and protection equipment - Protection communication interfacing - Part 1: General
EN 50125-2:2002/corrigendum:2010 RAILWAY APPLICATIONS - ENVIRONMENTAL CONDITIONS FOR EQUIPMENT - PART 2: FIXED ELECTRICAL INSTALLATIONS
IEC 61643-1:2005 Low-voltage surge protective devices - Part 1: Surge protective devices connected to low-voltage power distribution systems - Requirements and tests
IEC 60255-22-3:2007 Measuring relays and protection equipment - Part 22-3: Electrical disturbance tests - Radiated electromagnetic field immunity
IEC 60099-1:1991+AMD1:1999 CSV Surge arresters - Part 1: Non-linear resistor type gapped surge arresters for a.c. systems
IEC 60255-5:2000 Electrical Relays - Part 5: Insulation coordination for measuring relays and protection equipment - Requirements and tests
IEC 60255-6:1988 Electrical relays - Part 6: Measuring relays and protection equipment
IEC 60255-22-2:2008 Measuring relays and protection equipment - Part 22-2: Electrical disturbance tests - Electrostatic discharge tests
IEC 60255-21-1:1988 Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section One: Vibration tests (sinusoidal)
EN 60255-21-1:1995 Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section 1: Vibration tests (sinusoidal)
HD 546.2.1 : 200S1 TELECONTROL EQUIPMENT & SYSTEMS - OPERATING CONDITIONS - ENVIRONMENTAL CONDITIONS & POWER SUPPLIES
IEC 60255-23:1994 Electrical relays - Part 23: Contact performance
EN 60255-21-2:1995 Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section 2: Shock and bump tests
IEC 60255-22-4:2008 Measuring relays and protection equipment - Part 22-4: Electrical disturbance tests - Electrical fast transient/burst immunity test

View more information
$478.43
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more