Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

BS EN 61375-1:2012

Current
Current

The latest, up-to-date edition.

Electronic railway equipment. Train communication network (TCN) General architecture
Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

31-08-2012

INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions, abbreviated terms, acronyms,
  and conventions
4 Basic architecture
5 Train backbone
6 Consist network
7 On-board data communication
Bibliography
Annex ZA (normative) - Normative references to
          international publications with their
          corresponding European publications
Annex ZZ (informative) - Coverage of Essential
          Requirements of EU Directives

Pertains to the architecture of data communication systems in open trains, i.e. it covers the architecture of a communication system for the data communication between vehicles of the said open trains, the data communication within the vehicles and the data communication from train to the ground.

This part of IEC 61375 applies to the architecture of data communication systems in open trains, i.e. it covers the architecture of a communication system for the data communication between vehicles of the said open trains, the data communication within the vehicles and the data communication from train to the ground.

The applicability of this part of IEC 61375 to the train network technologies allows for interoperability of individual vehicles within open trains in international traffic. The data communication systems inside vehicles are given as recommended solutions to cope with the said TCN. In any case, proof of compatibility between a proposed train backbone and a proposed consist network will have to be brought by the supplier.

This part of IEC 61375 may be additionally applicable to closed trains and multiple unit trains when so agreed between purchaser and supplier.

NOTE 1 For a definition of open trains, multiple unit trains and closed trains, see Clause 3.

NOTE 2 Road vehicles such as buses and trolley buses are not considered in this part of IEC 61375.

Committee
GEL/9/-/4
DevelopmentNote
Supersedes 09/30205442 DC. (08/2012)
DocumentType
Standard
Pages
54
PublisherName
British Standards Institution
Status
Current
Supersedes

Standards Relationship
IEC 61375-1:2012 Identical
EN 61375-1:2012 Identical

ISO/IEC 7498-1:1994 Information technology Open Systems Interconnection Basic Reference Model: The Basic Model
UIC 556 : 5ED 2009 INFORMATION TRANSMISSION IN THE TRAIN (TRAIN-BUS)
2008/57/EC : 2008 AMD 5 2014 DIRECTIVE 2008/1957/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL OF 17 JUNE 2008 ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE COMMUNITY (RECAST) (TEXT WITH EEA RELEVANCE)
IEC 61375-3-1:2012 Electronic railway equipment - Train communication network (TCN) - Part 3-1: Multifunction Vehicle Bus (MVB)
ISO/IEC 19501:2005 Information technology — Open Distributed Processing — Unified Modeling Language (UML) Version 1.4.2
IEC 61375-2-1:2012 Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB)
ISO/IEC 9646-1:1994 Information technology Open Systems Interconnection Conformance testing methodology and framework Part 1: General concepts
ISO/IEC 8824-1:2015 Information technology Abstract Syntax Notation One (ASN.1): Specification of basic notation Part 1:

View more information
$568.62
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more