BS IEC 60300-3.7 : 1999
Current
The latest, up-to-date edition.
Hardcopy , PDF
English
01-01-1999
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Definitions
4 Acronyms
5 General considerations for a reliability stress
screening programme
6 General information about the reliability stress
screening process
7 Analysis of the benefits of the reliability stress
screening process
8 Characteristics of a successful reliability stress
screening programme
9 Screening types
10 Screening levels
11 Screening strength
12 Selection of screens
13 Flaws detected by a reliability stress screening
process
14 Pre-production screening process
15 Planning, performing and eliminating a reliability
stress screening process
15.1 General
15.2 Step 1 - Identification of objectives and goals
15.3 Step 2 - Screening process design and application
15.4 Step 3 - Cost-benefit analysis
15.5 Step 4 - Preparation of a screening plan
15.6 Step 5 - Screening process data collection,
analysis and corrective actions
Figures
1 Levels where reliability stress screening can be
performed
2 Reliability stress screening of repairable items
3 Flow chart for control of a reliability stress
screening process
A.1 Level chosen for the RSS process
Table
A.1 Relation between the sensitivity of flaws and stresses
Annex A (informative) RSS of repairable items produced
in lots
Annex B (informative) RSS of electronic components
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.