Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

BS PAS 64(2013) : 2013

Current
Current

The latest, up-to-date edition.

MITIGATION AND RECOVERY OF WATER DAMAGED BUILDINGS - CODE OF PRACTICE
Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2013

Foreword
Introduction
1 Scope
2 Terms and definitions
3 Mitigation and recovery process
4 Documentation for provision to the customer
5 Building repair and reinstatement
Annexes
Annex A (informative) - The initial inspection
Annex B (informative) - Sources of water damage and
        their health risks for occupants
Annex C (informative) - Surveying for practical moisture
        measurement thresholds
Annex D (informative) - Drying goal recording document
Annex E (informative) - Moisture measurement
Annex F (informative) - General decontamination
        clearance - Achieving the cleaning goal
Annex G (informative) - Indoor air quality
Annex H (informative) - Drying methods, systems and
        equipment
Annex I (informative) - Example environmental impact
        assessment
Annex J (informative) - Cost benefit calculation assessment
Annex K (informative) - Drying goal data
Annex L (informative) - Example completion certificate
Annex M (informative) - Example of an information leaflet
        for property owners/occupiers
Bibliography

Includes the mitigation and recovery process including: a) initial inspection of a water damaged building; b) setting drying and cleaning goals (including air quality goals); c) selecting the drying and cleaning techniques and equipment to be used; d) monitoring the drying and cleaning progress; e) verifying drying and cleaning goals have been met; and f) documentation for provision to the customer.

Committee
ZZ/3
DevelopmentNote
Supersedes BS PAS 64(2005). (08/2013)
DocumentType
Standard
Pages
56
PublisherName
British Standards Institution
Status
Current

15/30296351 DC : 0 BS 12999 - DAMAGE MANAGEMENT - STABILIZATION, MITIGATION AND RESTORATION OF PROPERTIES, CONTENTS, FACILITIES AND ASSETS FOLLOWING INCIDENT DAMAGE
15/30299685 DC : 0 BS 85500 - GUIDE TO IMPROVING THE FLOOD PERFORMANCE OF BUILDINGS - FLOOD RESISTANT AND RESILIENT CONSTRUCTION
BS 12999:2015 Damage management. Code of practice for the organization and management of the stabilization, mitigation and restoration of properties, contents, facilities and assets following incident damage

BS ISO 16000-19 : 2012 INDOOR AIR - PART 19: SAMPLING STRATEGY FOR MOULDS
BS EN ISO/IEC 17025:2005 General requirements for the competence of testing and calibration laboratories

View more information
$247.06
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more