Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

PD CLC/TS 62603-1:2014

Current
Current

The latest, up-to-date edition.

Industrial process control systems. Guideline for evaluating process control systems Specifications
Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

30-11-2014

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Symbols and abbreviated terms
4 Technical specifications of a PCS
Annex A (informative) - Table for 'System Architecture'
Annex B (informative) - Table for 'Installation Environment'
Annex C (informative) - Table for 'System characteristics'
Annex D (informative) - Table for 'System dependability'
Annex E (informative) - Table for 'Input/Output specification'
Annex F (informative) - Table for 'Software requirements'
Annex G (informative) - Table for 'Human Machine Interface (HMI)'
Annex H (informative) - Table for 'Communication requirements'
Annex I (informative) - Table for 'Required performances'
Annex J (informative) - Table for 'Life Cycle Support'
Annex K (informative) - Table for 'FAT specifications'
Annex ZA (normative) - Normative references to
         international publications with their
         corresponding European publications

Explains methods and provides guidance for the evaluation of Process Control Systems (PCS) during the phase of selection between different proposals.

This International Technical Specification describes methods and provides guidance for the evaluation of Process Control Systems (PCS) during the phase of selection between different proposals.

The methods of evaluation proposed in this technical specification are intended for use mainly by users, engineering companies, or independent test laboratories, to verify manufacturers’ proposals during the tender (as described in IEC 62603-1) or the provided Process Control System during the FAT procedure.

The specification and test procedures specified in this technical specification apply to a large variety of automation systems, both based on conventional technology (e.g. 4 mA to 20 mA field devices) and based on Intelligent Field Devices (IFD) with serial communication of any kind. For this reason, the tests specified in this technical specification are not necessarily sufficient for automation systems specifically designed for special duties. In such cases, user and manufacturer should define additional tests for assessing specific functions or performances.

The procedure for specifying the PCS technical requirements, evaluating the different offers, and carrying out the tests on the chosen PCS differs from one company to another and from one project to another, but some common steps exist, as Figure 1 shows. The IEC 62603 considers this process divided into two steps: definition of the PCS technical requirements (in the scope of IEC 62603-1) and test of the chosen PCS.

The first step of the specification of a PCS is to define the process requirements, in terms of required performances to achieve a satisfactory control of the process. Normally these requirements are defined with a joint effort of process engineers, automation, and instrumentation experts. From the process requirements, the automation engineers derive the PCS technical requirements, that is the functionalities the PCS should offer to achieve the required goals. Based on the process requirements and the PCS technical requirements, suppliers prepare their technical offers, and the evaluation procedure starts. IEC 62603-1 suggests a possible procedure for assessing the fitness of a proposed PCS to the specifications, based on a simple algorithm that considers the weight (importance) of each single required function.

After the selection of the PCS maker, the implementation stage starts. When the PCS is ready, prior to shipping the PCS on site and sometimes even during the implementation stage, the user/engineer may perform a set of Factory Acceptance Tests.

The technical evaluation of the tenders (IEC 62603-1) is mostly based on the evaluation of documents and data-sheets, and it may require simple calculations, e.g. for performance calculation. These verifications are based on general data of the proposed automation systems, not dedicated to any specific piece of hardware of software.

On the contrary, the FAT is mostly based on testing activities in laboratories or factories on a specific PCS including both the physical devices and the application software.

Figure 2 shows the typical process of PCS evaluation in an automation project.

The first evaluation is needed to select one supplier from a number of proposals. The reference document is the PCS technical requirements provided by the user or by a delegated engineering company. Scope of the evaluation at this stage is to verify if the proposed systems support the specified functions and performances. Evaluation is mostly based on the documents supplied by the supplier, such as technical data-sheets, manuals, conformity declarations, and so on. The PCS technical requirements should include the description of the required FAT procedure.

After the supplier\'s selection, the detailed engineering stage starts, and the user (or the delegated engineering company) produces a document that describes the software requirements in details. The PCS supplier assembles the PCS and implements the logic. After the completion of in-house tests, the Factory Acceptance Tests starts.

Several aspects of process control systems are in the scope of existing IEC standards that are to be considered together with the present document. This technical specification reports abstracts of the cited IEC standards based on the revisions available at the date of submission. Users should consult the most recent versions of the referenced standards for the actual requirements.

Committee
GEL/65/2
DevelopmentNote
Renumbers and supersedes BS PD IEC/TS 62603-1. 2014 Version incorporates corrigendum to BS PD IEC/TS 62603-1. (11/2014)
DocumentType
Standard
Pages
116
PublisherName
British Standards Institution
Status
Current
Supersedes

Standards Relationship
CLC/TS 62603-1:2014 Identical

IEC 61025:2006 Fault tree analysis (FTA)
IEC 61000-4-8 : 2.0 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-8: TESTING AND MEASUREMENT TECHNIQUES - POWER FREQUENCY MAGNETIC FIELD IMMUNITY TEST
IEC 61000-4-10 : 2.0 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-10: TESTING AND MEASUREMENT TECHNIQUES - DAMPED OSCILLATORY MAGNETIC FIELD IMMUNITY TEST
EN 61069-7:2016 Industrial-process measurement, control and automation - Evaluation of system properties for the purpose of system assessment - Part 7: Assessment of system safety
IEC 61069-8:2016 Industrial-process measurement, control and automation - Evaluation of system properties for the purpose of system assessment - Part 8: Assessment of other system properties
EN 60654-2:1997 Operating conditions for industrial-process measurement and control equipment - Part 2: Power
IEC 60038:2009 IEC standard voltages
IEC 60079-10:2002 Electrical apparatus for explosive gas atmospheres - Part 10: Classification of hazardous areas
HD 546.4 : 200S1 TELECONTROL EQUIPMENT AND SYSTEMS - PERFORMANCE REQUIREMENTS
IEC 60654-4:1987 Operating conditions for industrial-process measurement and control equipment. Part 4: Corrosive and erosive influences
EN 60300-3-4:2008 Dependability management - Part 3-4: Application guide - Guide to the specification of dependability requirements
IEC 61000-6-4:2006+AMD1:2010 CSV ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 6-4: GENERIC STANDARDS - EMISSION STANDARD FOR INDUSTRIAL ENVIRONMENTS
IEC 61158-2:2014 Industrial communication networks - Fieldbus specifications - Part 2: Physical layer specification and service definition
EN 60721-3-1:1997 Classification of environmental conditions - Part 3: Classification of groups of environmental parameters and their severities - Section 1: Storage
IEC 61069-5:2016 Industrial-process measurement, control and automation - Evaluation of system properties for the purpose of system assessment - Part 5: Assessment of system dependability
IEC 61069-4:2016 Industrial-process measurement, control and automation - Evaluation of system properties for the purpose of system assessment - Part 4: Assessment of system performance
EN 62381:2012 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT)
IEC 61000-4-4 : 3.0EN+(REDLINE+VERSION) ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-4: TESTING AND MEASUREMENT TECHNIQUES - ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST
EN 60079-10-1:2015 Explosive atmospheres - Part 10-1: Classification of areas - Explosive gas atmospheres
IEC 61131-3:2013 Programmable controllers - Part 3: Programming languages
EN 61000-4-11:2004/A1:2017 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-11: TESTING AND MEASUREMENT TECHNIQUES - VOLTAGE DIPS, SHORT INTERRUPTIONS AND VOLTAGE VARIATIONS IMMUNITY TESTS (IEC 61000-4-11:2004/A1:2017)
EN 61131-2:2007 Programmable controllers - Part 2: Equipment requirements and tests
EN 61000-4-9:2016 Electromagnetic compatibility (EMC) - Part 4-9: Testing and measurement techniques - Impulse magnetic field immunity test
IEC 61069-1:2016 Industrial-process measurement, control and automation - Evaluation of system properties for the purpose of system assessment - Part 1: Terminology and basic concepts
IEC 60300-3-4:2007 Dependability management - Part 3-4: Application guide - Guide to the specification of dependability requirements
IEC 61000-4-11:2004+AMD1:2017 CSV Electromagnetic compatibility (EMC) - Part 4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests
ISO/IEC 14764:2006 Software Engineering Software Life Cycle Processes Maintenance
IEC 62443-2-1:2010 Industrial communication networks - Network and system security - Part 2-1: Establishing an industrial automation and control system security program
IEC 61000-4-8:2009 Electromagnetic compatibility (EMC) - Part 4-8: Testing and measurement techniques - Power frequency magnetic field immunity test
IEC 62381:2012 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
IEC 61078:2016 Reliability block diagrams
EN 61069-4:2016 Industrial-process measurement, control and automation - Evaluation of system properties for the purpose of system assessment - Part 4: Assessment of system performance
IEC 61000-4-4:2012 RLV Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test
EN 60079-10-2:2015 Explosive atmospheres - Part 10-2: Classification of areas - Explosive dust atmospheres
IEEE 802.11-2016 IEEE Standard for Information technology--Telecommunications and information exchange between systems Local and metropolitan area networks--Specific requirements - Part 11: Wireless LAN Medium Access Control (MAC) and Physical Layer (PHY) Specifications
EN 61000-4-2:2009 Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test
IEC 60079-10-1:2015 Explosive atmospheres - Part 10-1: Classification of areas - Explosive gas atmospheres
IEC 60870-4:1990 Telecontrol equipment and systems. Part 4: Performance requirements
EN 60654-4:1997 Operating conditions for industrial-process measurement and control equipment - Part 4: Corrosive and erosive influences
EN 61131-3:2013 Programmable controllers - Part 3: Programming languages
EN 62347:2007 Guidance on system dependability specifications
EN 61078 : 1991 RELIABILITY BLOCK DIAGRAMS (IEC 61078:2016)
IEC TR 62380:2004 Reliability data handbook - Universal model for reliability prediction of electronics components, PCBs and equipment
EN 62305-4:2011/AC:2016-11 Protection against lightning - Part 4: Electrical and electronic systems within structures
IEC 61000-4-6 : 4.0 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-6: TESTING AND MEASUREMENT TECHNIQUES - IMMUNITY TO CONDUCTED DISTURBANCES, INDUCED BY RADIO-FREQUENCY FIELDS
IEC 62305-1:2010 Protection against lightning - Part 1: General principles
IEC 61000-4-6:2013 Electromagnetic compatibility (EMC) - Part 4-6: Testing and measurement techniques - Immunity to conducted disturbances, induced by radio-frequency fields
EN 60848:2013 GRAFCET specification language for sequential function charts
EN 61000-4-3 : 2006 AMD 2 2010 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-3: TESTING AND MEASUREMENT TECHNIQUES - RADIATED, RADIO-FREQUENCY, ELECTROMAGNETIC FIELD IMMUNITY TEST
EN 60079-11:2012 Explosive atmospheres - Part 11: Equipment protection by intrinsic safety "i"
EN 61326-1:2013 Electrical equipment for measurement, control and laboratory use - EMC requirements - Part 1: General requirements
IEC 60079-11:2011 Explosive atmospheres - Part 11: Equipment protection by intrinsic safety "i"
IEC 61000-4-9 : 2.0 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-9: TESTING AND MEASUREMENT TECHNIQUES - IMPULSE MAGNETIC FIELD IMMUNITY TEST
EN 61069-1:2016 Industrial-process measurement, control and automation - Evaluation of system properties for the purpose of system assessment - Part 1: Terminology and basic concepts
IEC 62347:2006 Guidance on system dependability specifications
EN 60654-3:1997 Operating conditions for industrial-process measurement and control equipment - Part 3: Mechanical influences
EN 61000-4-8:2010 Electromagnetic compatibility (EMC) - Part 4-8: Testing and measurement techniques - Power frequency magnetic field immunity test
IEC 61069-7:2016 Industrial-process measurement, control and automation - Evaluation of system properties for the purpose of system assessment - Part 7: Assessment of system safety
EN 61000-6-4:2007/A1:2011 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 6-4: GENERIC STANDARDS - EMISSION STANDARD FOR INDUSTRIAL ENVIRONMENTS
EN 61025:2007 Fault tree analysis (FTA)
IEC 60721-3-2:1997 Classification of environmental conditions - Part 3: Classification of groups of environmental parameters and their severities - Section 2: Transportation
IEC 61000-4-2:2008 Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test
IEC 60848:2013 GRAFCET specification language for sequential function charts
IEC 61000-4-3:2006+AMD1:2007+AMD2:2010 CSV Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity test
EN 60079-10:2003 Electrical apparatus for explosive gas atmospheres - Part 10: Classification of hazardous areas
EN 61069-8:2016 Industrial-process measurement, control and automation - Evaluation of system properties for the purpose of system assessment - Part 8: Assessment of other system properties
EN 60654-1 : 1993 Industrial-process measurement and control equipment - Operating conditions - Part 1: Climatic conditions
IEC 60079-14:2013 Explosive atmospheres - Part 14: Electrical installations design, selection and erection
IEC 61069-6:2016 Industrial-process measurement, control and automation - Evaluation of system properties for the purpose of system assessment - Part 6: Assessment of system operability
IEC 61000-6-4:2006+AMD1:2010 CSV Electromagnetic compatibility (EMC) - Part 6-4: Generic standards - Emission standard for industrial environments
ISA 37.1 : 1975 ELECTRICAL TRANSDUCER NOMENCLATURE AND TERMINOLOGY
EN 60079-14:2014/AC:2016 EXPLOSIVE ATMOSPHERES - PART 14: ELECTRICAL INSTALLATIONS DESIGN, SELECTION AND ERECTION (IEC 60079-14:2013/COR1:2016)
IEC 60721-3-3:1994+AMD1:1995+AMD2:1996 CSV Classification of environmental conditions - Part 3-3: Classification of groups of environmental parameters and their severities - Stationary use at weatherprotected locations
EN 61069-5:2016 Industrial-process measurement, control and automation - Evaluation of system properties for the purpose of system assessment - Part 5: Assessment of system dependability
IEC 61131-2:2017 Industrial-process measurement and control - Programmable controllers - Part 2: Equipment requirements and tests
EN 61000-4-4:2012 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-4: TESTING AND MEASUREMENT TECHNIQUES - ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST (IEC 61000-4-4:2012)
EN 61140:2016 Protection against electric shock - Common aspects for installation and equipment
EN 61000-4-6:2014/AC:2015 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-6: TESTING AND MEASUREMENT TECHNIQUES - IMMUNITY TO CONDUCTED DISTURBANCES, INDUCED BY RADIO-FREQUENCY FIELDS (IEC 61000-4-6:2013)
EN 60721-3-2:1997 Classification of environmental conditions - Part 3: Classification of groups of environmental parameters and their severities - Section 2: Transportation
IEC 60654-1:1993 Industrial-process measurement and control equipment - Operating conditions - Part 1: Climatic conditions
ANSI/ISA-18.2:2016 MANAGEMENT OF ALARM SYSTEMS FOR THE PROCESS INDUSTRIES
EN 61069-6:2016 Industrial-process measurement, control and automation - Evaluation of system properties for the purpose of system assessment - Part 6: Assessment of system operability
IEC 61140:2016 Protection against electric shock - Common aspects for installation and equipment
ISA 18.1 : 1979 ANNUNCIATOR SEQUENCES AND SPECIFICATIONS
EN 60721-3-4:1995/A1:1997 CLASSIFICATION OF ENVIRONMENTAL CONDITIONS - PART 3: CLASSIFICATION OF GROUPS OF ENVIRONMENTAL PARAMETERS AND THEIR SEVERITIES - SECTION 4: STATIONARY USE AT NON-WEATHER-PROTECTED LOCATIONS
EN 61000-4-10:2017 Electromagnetic compatibility (EMC) - Part 4-10: Testing and measurement techniques - Damped oscillatory magnetic field immunity test
EN 60038 : 2011 CENELEC STANDARD VOLTAGES (IEC 60038:2009, MODIFIED)
IEC 60654-3:1983 Operating conditions for industrial-process measurement and control equipment - Part 3: Mechanical influences
IEC 60721-3-1:1997 Classification of environmental conditions - Part 3 Classification of groups of environmental parameters and their severities - Section 1: Storage
EN 60721-3-3 : 95 AMD 2 97 CLASSIFICATION OF ENVIRONMENTAL CONDITIONS - CLASSIFICATION OF GROUPS OF ENVIRONMENTAL PARAMETERS AND THEIR SEVERITIES - STATIONARY USE AT WEATHER-PROTECTED LOCATIONS

View more information
$650.98
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more