Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

CEN/TR 12101-4:2009

Current
Current

The latest, up-to-date edition.

Smoke and heat control systems - Part 4: Installed SHEVS systems for smoke and heat ventilation
Published date

14-01-2009

Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Description of the principles of operation for smoke and heat
   control systems
   4.1 Smoke and heat control systems which rely on the principle
       of the creation of a smoke layer
       4.1.1 Smoke layers exhausted by natural vents
       4.1.2 Layers of smoke exhausted by powered vents
   4.2 Smoke free areas by differential pressure systems
   4.3 Air renewal of the room with fresh air by dilution of smoke
5 Description of the combination of products for construction
   of SHEVS
   5.1 General
   5.2 General requirements
   5.3 Requirements for smoke layer systems with natural
       ventilators
   5.4 Requirements for smoke layer systems with powered
       ventilators
       5.4.1 Requirements for power supplies for powered smoke
             and heat exhaust ventilation systems
       5.4.2 Requirements for powered smoke and heat exhaust
             systems
   5.5 Requirements for smoke free area systems by differential
       pressure
   5.6 Requirements for smoke control by air renewal of the
       room with fresh air by dilution of smoke
6 Air Inlet
   6.1 General requirements
   6.2 Fire behaviour requirements
       6.2.1 Performance parameters under fire conditions
       6.2.2 Reaction to fire
       6.2.3 Resistance to fire
   6.3 Geometric areas for natural air inlets
7 Tubes, cables and accessories
   7.1 General requirements
   7.2 Fire behaviour requirements
       7.2.1 Performance parameters under fire conditions
       7.2.2 Reaction to fire of cables and tubes
       7.2.3 Resistance to fire of cables and tubes
       7.3.2 Requirements for electrical supplies
       7.3.3 Isolators and switches on power lines
       7.3.4 Enclosures for electrical components
       7.3.5 Extra low voltage operated components
       7.3.6 Sizing of electrical cables and related equipment
   7.4 Requirements for pneumatic supplies
       7.4.1 Requirements for pneumatic supplies using
             compressors
       7.4.2 Requirements for pneumatic lines
       7.4.3 Mechanical cables
8 Requirements for installation
   8.1 General requirements for installation
   8.2 Requirements for installation of a SHEVS
   8.3 Requirements for installation of power supplies
   8.4 Requirements for installation of controls
   8.5 Access to components
   8.6 Requirements for installation of powered SHEVS
   8.7 Requirements for installation of air inlets
   8.8 General requirements for installation of smoke barriers
       8.8.1 Fastenings and adjacent surfaces
       8.8.2 Maximum gaps
       8.8.3 Response time
   8.9 Functional test
9 Handing-over and commissioning
   9.1 Requirements for commissioning of the system
   9.2 Requirements for acceptance report of the system
   9.3 Technical information report
   9.4 Specific requirements for powered smoke ventilation
       systems
10 Routine checking
11 Maintenance
   11.1 General
   11.2 Scope of maintenance
   11.3 Functional test
   11.4 Maintenance operations
   11.5 Availability
Annex A (normative) Pneumatic system leakage testing
Annex B (normative) Air flow measurements
      B.1 Air flow requirements in powered ventilation systems
      B.2 Measurement of air flow for ducted systems
          B.2.1 Selection of measurement method
          B.2.2 Selection of cross section
          B.2.3 Measurement of air flow
Annex C (informative) Drawings of example systems
Annex D (informative) Detailed engineering plan
      D.1 Detailed engineering plan for smoke flow and pressure
          control within the premises
          D.1.1 General
          D.1.2 Requirements for SHEVS intended to form a
                smoke layer
          D.1.3 Requirements for natural smoke and heat exhaust
                ventilation systems
          D.1.4 Requirements for powered smoke exhaust systems
          D.1.5 Functioning and requirements for differential
                pressure systems
          D.1.6 Requirements for differential pressure systems
      D.2 Requirements for assembly, commissioning, inspection,
          testing and maintenance of natural smoke exhaust systems
Annex E (informative) Requirements specific to powered smoke
        exhaust systems (powered fans, dampers, ducts etc) -
        Mounting and testing
      E.1 Requirements for mounting and commissioning
          E.1.1 General
          E.1.2 Mounting of powered smoke and heat exhaust
                systems
          E.1.3 Mounting of the operating devices
          E.1.4 Mounting of control devices and circuits
          E.1.5 Mounting of components of powered smoke
                exhaust systems
      E.2 Requirements for acceptance and testing
          E.2.1 General
          E.2.2 Acceptance and testing of powered smoke and
                heat exhaust system
      E.3 Requirements for routine checking
      E.4 Requirements for maintenance
          E.4.1 General
          E.4.2 Scope of maintenance
          E.4.3 Functional test
          E.4.4 Maintenance operations
          E.4.5 Availability
Bibliography

This Technical Report applies to SHEVS when installed in a building. This Technical Report specifies the ability of the system to meet the required performances of the SHEVS as specified by the design of the system. This Technical Report is to help to translate the detailed engineering plan into an installed system, but it does not state how the design is made. This Technical Report also covers requirements for components and compatibility between components to ensure that the requirements on the installed system will be met. This Technical report includes requirements for the assembly, installation, commissioning, function testing, maintenance, periodic servicing and routine testing of SHEVS.

Committee
CEN/TC 191
DocumentType
Technical Report
PublisherName
Comite Europeen de Normalisation
Status
Current

BS EN 1366-10 : 2011 FIRE RESISTANCE TESTS FOR SERVICE INSTALLATIONS - PART 10: SMOKE CONTROL DAMPERS
I.S. EN 1366-10:2011 FIRE RESISTANCE TESTS FOR SERVICE INSTALLATIONS - PART 10: SMOKE CONTROL DAMPERS
DIN EN 1366-10:2011-07 FIRE RESISTANCE TESTS FOR SERVICE INSTALLATIONS - PART 10: SMOKE CONTROL DAMPERS
UNE-EN 1366-10:2016 Fire resistance tests for service installations - Part 10: Smoke control dampers
EN 1366-10:2011+A1:2017 Fire resistance tests for service installations - Part 10: Smoke control dampers
14/30301589 DC : 0 BS EN 1364-5 - FIRE RESISTANCE TESTS FOR NON-LOADBEARING ELEMENTS - PART 5: AIR TRANSFER GRILLES
UNI EN 1366-10 : 2011 FIRE RESISTANCE TESTS FOR SERVICE INSTALLATIONS - PART 10: SMOKE CONTROL DAMPERS

ISO 2408:2017 Steel wire ropes — Requirements
ISO 5168:2005 Measurement of fluid flow — Procedures for the evaluation of uncertainties
EN 12101-2:2017 Smoke and heat control systems - Part 2: Natural smoke and heat exhaust ventilators
EN 12101-3:2015 Smoke and heat control systems - Part 3: Specification for powered smoke and heat control ventilators (Fans)
EN 13501-4:2016 Fire classification of construction products and building elements - Part 4: Classification using data from fire resistance tests on components of smoke control systems
EN 13501-2:2016 Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services
ISO 5801:2017 Fans — Performance testing using standardized airways
EN 1366-9:2008 Fire resistance tests for service installations - Part 9: Single compartment smoke extraction ducts
EN ISO 5167-1:2003 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full - Part 1: General principles and requirements (ISO 5167-1:2003)
IEC 60529:1989+AMD1:1999+AMD2:2013 CSV Degrees of protection provided by enclosures (IP Code)
EN 12101-10:2005/AC:2007 SMOKE AND HEAT CONTROL SYSTEMS - PART 10: POWER SUPPLIES
ISO 5167-1:2003 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full Part 1: General principles and requirements
EN 1366-8:2004 Fire resistance tests for service installations - Part 8: Smoke extraction ducts
EN 12101-1:2005/A1:2006 SMOKE AND HEAT CONTROL SYSTEMS - PART 1: SPECIFICATION FOR SMOKE BARRIERS
EN 13501-3:2005+A1:2009 Fire classification of construction products and building elements - Part 3: Classification using data from fire resistance tests on products and elements used in building service installations: fire resisting ducts and fire dampers
ISO 7194:2008 Measurement of fluid flow in closed conduits — Velocity-area methods of flow measurement in swirling or asymmetric flow conditions in circular ducts by means of current-meters or Pitot static tubes
ISO 5221:1984 Air distribution and air diffusion Rules to methods of measuring air flow rate in an air handling duct
EN 60529:1991/AC:2016-12 DEGREES OF PROTECTION PROVIDED BY ENCLOSURES (IP CODE) (IEC 60529 EDITION 2.2 CORRIGENDUM 2:2015)
ISO 3966:2008 Measurement of fluid flow in closed conduits Velocity area method using Pitot static tubes
EN 12101-6:2005/AC:2006 SMOKE AND HEAT CONTROL SYSTEMS - PART 6: SPECIFICATION FOR PRESSURE DIFFERENTIAL SYSTEMS - KITS

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more