DEFSTAN 00-42(PT3)/3(2008) : 2008
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
Hardcopy , PDF
17-06-2011
English
01-01-2008
0 Introduction
1 Scope
2 Warning
3 Related Documents
4 Definitions
5 The Principles of The R&M Case
5.1 Introduction
5.2 R&M Strategy Overview
5.3 R&M Case Review
6 The Application of the R&M Case Through the System
Life Cycle
6.1 Introduction
6.2 Initial R&M Case
6.3 Tender Stage R&M Case and Case Reports
6.4 R&M Case and Case Reports - Post Contract Award
6.5 Purchaser's R&M Activities During Procurement
6.6 In-Service R&M Case
6.7 Modifications
6.8 Progressive Assurance of R&M
6.9 The R&M Programme Plan
7 Providing the Evidence
8 Guidance On How To Present The Evidence
9 Guidance on How to Assess the Adequacy of Evidence
Annex A - General Requirements for the R&M Case and R&M
Case Report
A.1 R&M Case
A.1.1 System Description
A.1.2 R&M Requirements
A.1.3 R&M Risk Areas
A.1.4 R&M Strategy
A.1.5 The Evidence Framework
A.1.6 R&M Claims
A.1.7 Limitations on Use
A.1.8 Conclusions and Recommendations
A.2 R&M Case Reports
Annex B - Examples of R&M Risks at the Different Stages of
a Systems Life Cycle
Annex C - CHECKLIST OF POINTS FOR ASSESSING THE ADEQUACY
OF EVIDENCE
Annex D - R&M Risk Reduction Process
Annex E - R&M Case Evidence Framework
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.