DEFSTAN 03-34/5(2009) : 2009
Current
The latest, up-to-date edition.
ARC WELDING OF FERROUS ARMOUR
Hardcopy , PDF
English
20-02-2009
Revision Note
Historical Record
Introduction
1 Scope
2 Warning
3 Related Documents
4 Definitions
5 Documents
6 Materials and Consumables
7 Resistance to Cracking
8 Resistance to Ballistic Attack
9 Equipment and Workshop Conditions
10 Preparation of Materials
11 Welding Procedure
12 Workmanship
13 Faults and Repairs
14 Heat Treatment
15 Inspection and Supervision
Annex A - Procedure for the R.D Rigid Butt Test
Annex B - Procedure for the Swinden Tied Tee Test
Annex C - Procedure for the Reeve Fillet Weld as Modified
for Heavy Armour
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.