Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

DIN EN 14679 E : 2005

Current
Current

The latest, up-to-date edition.

EXECUTION OF SPECIAL GEOTECHNICAL WORKS - DEEP MIXING
Available format(s)

Hardcopy , PDF

Published date

01-01-2005

1 Scope
2 Normative references
3 Terms and definitions
4 Information needed for the execution of the work
   4.1 General
   4.2 Particular requirements
5 Geotechnical investigation
   5.1 General
   5.2 Specific information
6 Materials and products
   6.1 General
   6.2 Special considerations
7 Considerations related to design
   7.1 General
   7.2 Additional design considerations
   7.3 Selection of the binder and the additives
   7.4 Laboratory and in-situ mixing and treatment tests
   7.5 Design statement
8 Execution
   8.1 Method statement
   8.2 Preparation of the site
   8.3 Field trials
   8.4 Execution tolerances
        8.4.1 General
   8.5 Quality control and quality assurance
   8.6 Deep mixing
        8.6.1 General
        8.6.2 Dry mixing
        8.6.3 Wet mixing
   8.7 Installation of structural reinforcement
9 Supervision, testing and monitoring
   9.1 General
   9.2 Supervision
   9.3 Testing
   9.4 Monitoring
   9.5 Performance of the treated soil
   9.6 Other aspects
10 Records
   10.1 Records during construction
   10.2 Records at the completion of the work
11 Special requirements
   11.1 General
   11.2 Safety
   11.3 Environmental protection
   11.4 Impact on adjacent structures
Annex A (informative) Practical aspects of deep mixing
   A.1 Introduction
   A.2 Fields of application
   A.3 Execution
        A.3.1 General
        A.3.2 Dry mixing
        A.3.3 Wet mixing
        A.3.4 Patterns of installation
        A.3.5 Hybrid methods
   A.4 Construction considerations
Annex B (informative) Aspects of design
   B.1 General
        B.1.1 Scope
        B.1.2 Application
   B.2 Design principles
   B.3 Execution process of deep mixing
   B.4 Choice of binder
   B.5 Testing
        B.5.1 General
        B.5.2 Laboratory testing
        B.5.3 Field testing
   B.6 Correlation of various properties of treated soil
        B.6.1 Field strength and laboratory strength
        B.6.2 Correlation between mechanical characteristics and
              unconfined compressive strength
   B.7 Aspects of design
        B.7.1 Stability
        B.7.2 Settlement
        B.7.3 Confinement
Annex C (informative) Degree of obligation of the provision
Bibliography

Defines general principles for the execution, testing, supervision and monitoring of deep mixing works carried out by two different methods: dry mixing and wet mixing.

DocumentType
Standard
Pages
55
PublisherName
German Institute for Standardisation (Deutsches Institut für Normung)
Status
Current

EN 196-21 : 1989 METHODS OF TESTING CEMENT - DETERMINATION OF THE CHLORIDE, CARBON DIOXIDE AND ALKALI CONTENT OF CEMENT
EN 196-7:2007 Methods of testing cement - Part 7: Methods of taking and preparing samples of cement
EN 196-2:2013 Method of testing cement - Part 2: Chemical analysis of cement
EN 197-1:2011 Cement - Part 1: Composition, specifications and conformity criteria for common cements
EN 459-2:2010 Building lime - Part 2: Test methods
EN 12716:2001 EXECUTION OF SPECIAL GEOTECHNICAL WORKS - JET GROUTING
EN 196-5:2011 Methods of testing cement - Part 5: Pozzolanicity test for pozzolanic cement
EN 197-2:2014 Cement - Part 2: Conformity evaluation
ISO 14688-1:2002 Geotechnical investigation and testing Identification and classification of soil Part 1: Identification and description
EN 459-1:2015 BUILDING LIME - PART 1: DEFINITIONS, SPECIFICATIONS AND CONFORMITY CRITERIA
EN 791:1995+A1:2009 Drill rigs - Safety
EN 196-1:2016 Methods of testing cement - Part 1: Determination of strength
ISO 14689-1:2003 Geotechnical investigation and testing Identification and classification of rock Part 1: Identification and description
ISO 14688-2:2004 Geotechnical investigation and testing Identification and classification of soil Part 2: Principles for a classification
ENV 10080 : 1995 STEEL FOR THE REINFORCEMENT OF CONCRETE WELDABLE RIBBED REINFORCING STEEL B500 - TECHNICAL DELIVERY CONDITIONS FOR BARS, COILS AND WELDED FABRIC
EN ISO 14689-1 : 2003 GEOTECHNICAL INVESTIGATION AND TESTING - IDENTIFICATION AND CLASSIFICATION OF ROCK - PART 1: IDENTIFICATION AND DESCRIPTION
ISO 9000:2015 Quality management systems — Fundamentals and vocabulary
EN 1997-1:2004/A1:2013 EUROCODE 7: GEOTECHNICAL DESIGN - PART 1: GENERAL RULES
EN 196-8:2010 Methods of testing cement - Part 8: Heat of hydration - Solution method
EN 196-3:2016 Methods of testing cement - Part 3: Determination of setting times and soundness
EN ISO 9000:2015 Quality management systems - Fundamentals and vocabulary (ISO 9000:2015)

View more information
$234.29
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more