Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

FM 1111 : 1973

Current
Current

The latest, up-to-date edition.

POST-INDICATOR-VALVE-ASSEMBLY
Published date

12-01-2013

I. INTRODUCTION
II. GENERAL REQUIREMENTS
     2.1 Glossary
     2.2 Instructional Manual
     2.3 Marketing
     2.4 Markings
     2.5 Sizes
     2.6 Rated Working Pressure
     2.7 Factory Tests
III. DESIGN
     3.1 Waterway
     3.2 Orientation
     3.3 Visibility
     3.4 Design Factors of Safety
     3.5 Water Hammer
     3.6 Operation
     3.7 Ease of Operation
     3.8 Serviceability
     3.9 Impact Resistance (Shock Loading)
     3.10 Friction Loss
     3.11 Locking
     3.12 Seat Leakage
     3.13 Materials
     3.14 Post Design
IV. TESTS
     4.1 General
     4.2 Visibility
     4.3 Water Hammer
     4.4 Loss of Power Transmission Control
     4.5 Hydrostatic Test
     4.6 Seat Leakage
     4.7 Impact Resistance
     4.8 Durability
     4.9 Friction Loss
     4.10 Stem Seal
     4.11 Other

DocumentType
Standard
PublisherName
Factory Mutual Research Corporation
Status
Current

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more