Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

I.S. EN 61850-5:2013

Superseded
Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 5: COMMUNICATION REQUIREMENTS FOR FUNCTIONS AND DEVICE MODELS (IEC 61850-5:2013 (EQV))
Available format(s)

Hardcopy , PDF

Superseded date

06-06-2022

Language(s)

English

Published date

01-01-2013

Preview

For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.

Only cited Standards give presumption of conformance to New Approach Directives/Regulations.

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviations
5 Power utility automation functions
6 Goal and requirements
7 Categories of functions
8 Function description and function requirements
9 The application concept for logical nodes
10 System description and system requirements
11 Performance requirements
12 Additional requirements for the data model
Annex A (informative) - Logical nodes and related
        PICOMs
Annex B (informative) - PICOM identification and
        message classification
Annex C (informative) - Communication optimization
Annex D (informative) - Rules for function definition
Annex E (informative) - Interaction of functions and
        logical nodes
Annex F (informative) - Functions
Annex G (informative) - Results from function description
Annex H (informative) - Substation configurations
Annex I (informative) - Examples for protection functions
        in compensated networks
Bibliography
Annex ZA (normative) - Normative references to international
         publications with their corresponding European
         publications

Pertains to power utility automation systems with the core part of substation automation systems (SAS).

DevelopmentNote
For CENELEC adoptions of IEC publications, please check www.iec.ch to be sure that you have any corrigenda that may apply. (01/2017)
DocumentType
Standard
Pages
149
PublisherName
National Standards Authority of Ireland
Status
Superseded
SupersededBy
Supersedes

Standards Relationship
SN EN 61850-5 : 2003 Identical
EN 61850-5:2013 Identical
NBN EN 61850-5 : 2013 Identical
NF EN 61850-5 : 2013 Identical
DIN EN 61850-5:2014-06 Identical
BS EN 61850-5:2013 Identical

IEC 61000-4-30 : 3.0EN+(REDLINE+VERSION) ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-30: TESTING AND MEASUREMENT TECHNIQUES - POWER QUALITY MEASUREMENT METHODS
IEC 61000-4-15 : 2.0 ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-15: TESTING AND MEASUREMENT TECHNIQUES - FLICKERMETER - FUNCTIONAL AND DESIGN SPECIFICATIONS
EN 61850-6:2010 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
IEC 61850-6:2009 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
IEC 60870-4:1990 Telecontrol equipment and systems. Part 4: Performance requirements
IEC TR 61850-1:2013 Communication networks and systems for power utility automation - Part 1: Introduction and overview
IEC 60834-2:1993 Performance and testing of teleprotection equipment of power systems - Part 2: Analogue comparison systems
IEC 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
IEC TR 61850-90-1:2010 Communication networks and systems for power utility automation - Part 90-1: Use of IEC 61850 for the communication between substations
IEC 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
IEC 61850-7-3:2010 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes
IEC TR 61850-7-510:2012 Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines
IEC 61850-10:2012 Communication networks and systems for power utility automation - Part 10: Conformance testing
IEC TS 61850-2:2003 Communication networks and systems in substations - Part 2: Glossary
EN 61000-4-15:2011 Electromagnetic compatibility (EMC) - Part 4-15: Testing and measurement techniques - Flickermeter - Functional and design specifications
IEC 61850-3:2013 Communication networks and systems for power utility automation - Part 3: General requirements
IEC 60834-1:1999 Teleprotection equipment of power systems - Performance and testing - Part 1: Command systems

View more information
$305.05
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more