Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

IEC 61400-25-2:2015

Current
Current

The latest, up-to-date edition.

Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
Available format(s)

Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English - French

Published date

30-06-2015

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 General
6 Wind power plant logical node classes
7 Common data classes
Annex A (informative) - Information model for statistical
        data and historical statistical data
Annex B (normative) - Value range for units and multiplier
Annex C (normative) - Logical nodes for state log, analogue
        log and report information
Annex D (informative) - Wind power plant controller
Annex E (informative) - List of mandatory logical nodes
        and data
Annex F (informative) - Control authority management

IEC 61400-25-2:2015 specifies the information model of devices and functions related to wind power plant applications. In particular, it specifies the compatible logical node names, and data names for communication between wind power plant components. This includes the relationship between logical devices, logical nodes and data. The names defined in the IEC 61400-25 series are used to build the hierarchical object references applied for communicating with components in wind power plants. Main changes with respect to the previous edition consist of:
- harmonization with newer editions of IEC 61850 standards;
- reduction of overlap between standards and simplification by increased referencing,
- extension of data objects for operation of smart grids,
- extended and enhanced semantics for existing data objects, etc.

Committee
TC 88
DevelopmentNote
Stability Date: 2017. (07/2015)
DocumentType
Standard
Pages
221
PublisherName
International Electrotechnical Committee
Status
Current
Supersedes

PD IEC/TS 61850-80-1:2016 Communication networks and systems for power utility automation Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104
16/30340907 DC : 0 BS EN 61400-25-6 ED 2.0 - WIND TURBINES - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING
NF EN 61400-25-3 : 2016 WIND TURBINES - PART 25-3: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION EXCHANGE MODELS
BS EN 61400-25-1:2017 Wind energy generation systems Communications for monitoring and control of wind power plants. Overall description of principles and models
16/30344488 DC : 0 BS EN 61850-7-2+A1 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
CEI EN 61400-25-6 : 2011 WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING
I.S. EN 61850-7-2:2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
EN 61400-25-5:2017 Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing
IEC TR 61850-7-510:2012 Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines
CLC/TS 61400-26-3:2017 Wind energy generation systems - Part 26-3: Availability for wind power stations
CEI CLC/TS 61850-80-1 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED DATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104
IEC 61400-25-4:2016 RLV Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
EN 61400-25-1:2017 Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models
EN 61400-25-4:2017 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
IEC 61400-25-3:2015 RLV Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
EN 61400-25-6:2017 Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring
UFC 3-540-08 : 2017 UNIFIED FACILITIES CRITERIA - UTILITY-SCALE RENEWABLE ENERGY SYSTEMS
PD IEC/TR 61850-7-510:2012 Communication networks and systems for power utility automation Basic communication structure. Hydroelectric power plants. Modelling concepts and guidelines
08/30184178 DC : DRAFT JUNE 2008 BS EN 61400-25-6 - WIND TURBINES - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING
09/30212527 DC : 0 BS EN 61850-7-410 - COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL
CLC/TS 61400-26-1:2017 Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems
I.S. EN 61400-25-6:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-6: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - LOGICAL NODE CLASSES AND DATA CLASSES FOR CONDITION MONITORING
I.S. EN 61400-25-3:2015 WIND TURBINES - PART 25-3: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION EXCHANGE MODELS
PD CLC/TS 61400-26-2:2017 Wind turbines Production-based availability for wind turbines
IEC 61400-25-3 REDLINE : 2ED 2015 WIND TURBINES - PART 25-3: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION EXCHANGE MODELS
BS EN 61400-25-4:2008 Wind turbines Communications for monitoring and control of wind power plants. Mapping to communication profile
DD IEC TS 61850-80-1 : DRAFT JAN 2009 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED DATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104
CLC/TS 61850-80-1:2010 Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104
CEI EN 61400-25-4 : 2009 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
DD CLC/TS 61850-80-1:2010 Communication networks and systems for power utility automation Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104
BS EN 61400-25-5:2017 Wind energy generation systems Communications for monitoring and control of wind power plants. Compliance testing
IEC 61400-25-1:2017 Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models
I.S. EN 61400-25-1:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
IEC 61400-25-1 REDLINE : 2ED 2017 WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
IEC TS 61400-26-2:2014 Wind turbines - Part 26-2: Production-based availability for wind turbines
NF EN 61400-25-1 : 2017 WIND ENERGY GENERATION SYSTEMS - PART 25-1: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - OVERALL DESCRIPTION OF PRINCIPLES AND MODELS
05/30137805 DC : DRAFT AUG 2005 IEC 61400-25-3 ED 1 - WIND TURBINES - PART 25-3: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION
CLC/TS 61400-26-2:2017 Wind turbines - Part 26-2: Production-based availability for wind turbines
PD CLC/TS 61400-26-1:2017 Wind turbines Time-based availability for wind turbine generating systems
BS EN 61400-25-6:2017 Wind energy generation systems Communications for monitoring and control of wind power plants. Logical node classes and data classes for condition monitoring
BS PD IEC TS 61400-26-2 : 2014 WIND TURBINES - PART 26-2: PRODUCTION-BASED AVAILABILITY FOR WIND TURBINES
BS EN 61850-7-2:2010 Communication networks and systems for power utility automation Basic information and communication structure. Abstract communication service interface (ACSI)
S.R. CLC/TS 61850-80-1:2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 80-1: GUIDELINE TO EXCHANGING INFORMATION FROM A CDC-BASED ATA MODEL USING IEC 60870-5-101 OR IEC 60870-5-104
IEC TS 61400-26-1:2011 Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems
I.S. EN 61400-25-5:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - COMPLIANCE TESTING
NF EN 61400-25-4 : 2017 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
S.R. CLC/TS 61400-26-1:2017 WIND TURBINES - PART 26-1: TIME-BASED AVAILABILITY FOR WIND TURBINE GENERATING SYSTEMS
S.R. CLC/TS 61400-26-3:2017 WIND ENERGY GENERATION SYSTEMS - PART 26-3: AVAILABILITY FOR WIND POWER STATIONS
IEC TS 61850-80-1:2016 Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104
IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
IEC 61400-25-3:2015 Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
IEC TS 61400-26-3:2016 Wind energy generation systems - Part 26-3: Availability for wind power stations
EN 61850-7-2:2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
EN 61400-25-3:2015 Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
06/30145429 DC : DRAFT MAY 2006
PD CLC/TS 61400-26-3:2017 Wind energy generation systems Availability for wind power stations
05/30137813 DC : DRAFT AUG 2005 IEC 61400-25-5 ED 1 - WIND TURBINES - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - CONFORMANCE TESTING
BS EN 61400-25-3:2015 Wind turbines Communications for monitoring and control of wind power plants. Information exchange models
DD IEC TS 61400-26-1 : 2011 WIND TURBINES - PART 26-1: TIME-BASED AVAILABILITY FOR WIND TURBINE GENERATING SYSTEMS
PD IEC/TS 61400-26-3:2016 Wind energy generation systems Availability for wind power stations
I.S. EN 61400-25-4:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
IEC 61400-25-4 REDLINE : 2ED 2016 WIND ENERGY GENERATION SYSTEMS - PART 25-4: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - MAPPING TO COMMUNICATION PROFILE
S.R. CLC/TS 61400-26-2:2017 WIND TURBINES - PART 26-2: PRODUCTION-BASED AVAILABILITY FOR WIND TURBINES
IEC 61400-25-5:2017 Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing
IEC 61400-25-6:2016 Wind energy generation systems - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring
IEC 61400-25-1:2017 RLV Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models

IEC 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models
IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
IEC TS 61400-26-1:2011 Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems
IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
IEC 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
IEC 61400-25-1:2017 Wind energy generation systems - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models
ISO 80000-1:2009 Quantities and units — Part 1: General
IEC 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
IEC 61400-25-3:2015 Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
IEC 61850-7-3:2010 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes
IEEE 754-2008 REDLINE IEEE Standard for Floating-Point Arithmetic

View more information
$650.16
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more