Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

IPC 9194 : 0

Current
Current

The latest, up-to-date edition.

IMPLEMENTATION OF STATISTICAL PROCESS CONTROL (SPC) APPLIED TO PRINTED BOARD ASSEMBLY MANUFACTURE GUIDELINE
Available format(s)

Hardcopy

Language(s)

English

Published date

01-09-2004

1 SCOPE
  1.1 Purpose
  1.2 Interpretation
2 NORMATIVE REFERENCES
  2.1 IPC
  2.2 International Organization for Standardization
  2.3 Automotive Industry Action Group
3 TERMS AND DEFINITIONS
4 SPC OBJECTIVES
  4.1 General and Specific Objectives
  4.2 Financial Objectives
5 CONDITIONS FOR SPC
  5.1 Management Support
       5.1.1 Organizational Structure
       5.1.2 Implementation Plan
              5.1.2.1 Elements
              5.1.2.2 Action Plan
  5.2 Understanding of SPC Tools and Methods
       5.2.1 Executive Overview
       5.2.2 Basic Statistics and SPC Tools
       5.2.3 Advanced Problem Solving Tools
  5.3 Integration with Quality System
6 ELEMENTS OF STATISTICAL PROCESS CONTROL SYSTEM
  6.1 Process Documentation
       6.1.1 Process Mapping
       6.1.2 Establishing Process Targets and Limits and
              Performance Baseline
       6.1.3 Process Prioritization Matrix
       6.1.4 Parameter Identification
  6.2 Measurement System Evaluation
  6.3 Process Characterization
       6.3.1 Process Characterization Method
       6.3.2 Determining Parameter Capability
  6.4 Practicing SPC
       6.4.1 Employee Training and Involvement
       6.4.2 Control Plan
       6.4.3 Data Collection
  6.5 Data Analysis
  6.6 Documented Work Instructions
  6.7 Interpretation and Process Controls
  6.8 SPC Reporting - Process Levels and Trends
  6.9 Internal SPC Audits
  6.10 Management Review
  6.11 Improving Process Capability
       6.11.1 SPC Projects and Teams
       6.11.2 Process Improvement and Optimization
  6.12 Customer Information System
A1: IPC-9191 to IPC-9194 Correlation Matrix
A2: IPC-9194 to IPC-9191 Correlation Matrix

Provides practical guidelines for implementation of SPC in the electronics manufacturing operations for continually improving processes and reducing waste.

Committee
7-20
DevelopmentNote
To be used in conjunction with IPC 9191. (11/2004)
DocumentType
Standard
Pages
43
PublisherName
Institute of Printed Circuits
Status
Current

IPC 7801 : 0 REFLOW OVEN PROCESS CONTROL STANDARD

IPC T 50 : M TERMS AND DEFINITIONS FOR INTERCONNECTING AND PACKAGING ELECTRONIC CIRCUITS
AIAG APQP : 2ED 2008 ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN (APQP)
ISO/TR 10017:2003 Guidance on statistical techniques for ISO 9001:2000
IPC 9199 : 0 STATISTICAL PROCESS CONTROL (SPC) QUALITY RATING
AIAG MSA : 2010 ERRATA MEASUREMENT SYSTEMS ANALYSIS
ISO 10012:2003 Measurement management systems — Requirements for measurement processes and measuring equipment
ISO 9001:2015 Quality management systems — Requirements
ISO 11462-1:2001 Guidelines for implementation of statistical process control (SPC) Part 1: Elements of SPC
IPC 9191 : 0 GENERAL GUIDELINES FOR IMPLEMENTATION OF STATISTICAL PROCESS CONTROL (SPC)

View more information
$348.66
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more