Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

ISO 10784-1:2011

Current
Current

The latest, up-to-date edition.

Space systems Early operations Part 1: Spacecraft initialization and commissioning
Available format(s)

Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English

Published date

29-11-2011

Preview

A general definition of initialization is that it begins at separation of the spacecraft (SC) from the launcher. In some cases, a more exact definition will be that initialization begins in flight, upon planned change in mode or state of the SC from the launch configuration. Commissioning is completed when the SC, including its payload, is certified for initial mission operations. Prior to certification for mission operations, the SC is described as a test article in the three parts of ISO 10784. ISO 10784 does not include a requirement for contingency plans, but does include a statement of the need for contingency planning.

ISO 10784-1:2011 outlines general descriptive information for SC initialization and commissioning as might be appropriate for programme management, project engineering or programme test documentation. Since the SC is considered a test article at this phase of its operational life, ISO 17566 is used as a normative reference in constructing the initialization plan and the commissioning report. It provides SC manufacturers, SC operators and other stakeholders with a common language and form to verify and document spacecraft initialization and commissioning prior to normal SC mission operations.

DevelopmentNote
Supersedes ISO/DIS 10784-1. (12/2011)
DocumentType
Standard
Pages
8
PublisherName
International Organization for Standardization
Status
Current

Standards Relationship
BS ISO 10784-1:2011 Identical

14/30280994 DC : 0 BS ISO 16679 - SPACE SYSTEMS - RELATIVE MOTION ANALYSIS ELEMENTS AFTER LV/SC SEPARATION
BS ISO 10784-2:2011 Space systems. Early operations Initialization plan
ISO 10784-2:2011 Space systems Early operations Part 2: Initialization plan
ISO 10784-3:2011 Space systems Early operations Part 3: Commissioning report
BS ISO 10784-3:2011 Space systems. Early operations Commissioning report
ISO 16679:2015 Space systems Relative motion analysis elements after LV/SC separation
BS ISO 16679:2015 Space systems. Relative motion analysis elements after LV/SC separation

ISO 14303:2002 Space systems — Launch-vehicle-to-spacecraft interfaces
ISO 15863:2003 Space systems Spacecraft-to-launch-vehicle interface control document
ISO 24113:2011 Space systems Space debris mitigation requirements
ISO 10784-3:2011 Space systems Early operations Part 3: Commissioning report
ISO 17566:2011 Space systems General test documentation

View more information
$118.72
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more