Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

MIL-STD-3018 Base Document:2007

Current
Current

The latest, up-to-date edition.

Parts Management (S/S by MIL-STD-11991)
Available format(s)

PDF

Language(s)

English

Published date

15-10-2007

FOREWORD
1. SCOPE
2. APPLICABLE DOCUMENTS
3. DEFINITIONS
4. GENERAL REQUIREMENTS
5. DETAIL REQUIREMENTS
6. NOTES
Appendix A - Options for Statement of Work (SOW) Tasks
Appendix B - Parts Management Plan Development Guide
Concluding Material

Describes requirements for the implementation of an effective Parts Management Program (PMP) on Department of Defense (DoD) acquisitions.

This standard provides requirements for the implementation of an effective Parts Management Program (PMP) on Department of Defense (DoD) acquisitions. This document supports acquisition strategies and systems engineering practices. This document also provides performance-based parts management processes and practices which are intended to be adapted to individual program needs and which provide appropriate latitude for innovative approaches and design solutions by the contractors.

DevelopmentNote
Supersedes MIL HDBK 512 (A). (10/2007)
DocumentType
Standard
Pages
19
PublisherName
US Military Specs/Standards/Handbooks
Status
Current
Supersedes

GEIA TA HB 0009 : 2013 RELIABILITY PROGRAM HANDBOOK
SAE AIR 6006 : 2009 MODELING AND SIMULATION CAPABILITIES FOR AEROSPACE WDM LAN APPLICATIONS
SAE AS 6174 : 2014 COUNTERFEIT MATERIEL - ASSURING ACQUISITION OF AUTHENTIC AND CONFORMING MATERIEL
MIL-HDBK-502 Revision A:2013 Product Support Analysis
MIL-HDBK-780 Revision D:2004 STANDARD MICROCIRCUIT DRAWINGS
SAE ARP 6328 : 2016 GUIDELINE FOR DEVELOPMENT OF COUNTERFEIT ELECTRONIC PARTS; AVOIDANCE, DETECTION, MITIGATION, AND DISPOSITION SYSTEMS
IEC TS 62239-1:2015 Process management for avionics - Management plan - Part 1: Preparation and maintenance of an electronic components management plan
17/30365636 DC : 0 BS EN 62239-1 ED.1.0 - PROCESS MANAGEMENT FOR AVIONICS - MANAGEMENT PLAN - PART 1: PREPARATION AND MAINTENANCE OF AN ELECTRONIC COMPONENTS MANAGEMENT PLAN
PD IEC/TS 62239-1:2015 Process management for avionics. Management plan Preparation and maintenance of an electronic components management plan
EIA 933 : 2015 REQUIREMENTS FOR A COTS ASSEMBLY MANAGEMENT PLAN
GEIA STD 0016 : 2012 PREPARING A DMSMS MANAGEMENT PLAN

SD-19 Base Document:2013 LIFE CYCLE COST SAVINGS THROUGH PARTS MANAGEMENT
AIAA R 100 : A 2001 RECOMMENDED PRACTICE FOR PARTS MANAGEMENT
SD 22 : 20061101 DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES (DMSMS) GUIDEBOOK
EIA 4899 : 2001 STANDARD FOR PREPARING AN ELECTRONIC COMPONENTS MANAGEMENT PLAN

View more information
$32.74
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more