Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

PD ISO/TR 26762:2008

Current
Current

The latest, up-to-date edition.

Natural gas. Upstream area. Allocation of gas and condensate
Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

31-03-2009

Foreword
Introduction
1 Scope
2 Normative references
3 Economic aspects
   3.1 Overview
   3.2 Uncertainty and costs
   3.3 Allocation system overview
4 Allocation from different viewpoints and terminology
   4.1 Physical system
   4.2 Gas/condensate system overview
   4.3 Physical system terms
   4.4 Definitions for allocation systems
   4.5 Allocation from a commercial viewpoint
5 Quantity measurement for gas and condensate
   5.1 Introduction
   5.2 Quantity measurement by type of fluid streams
6 Quality measurement
   6.1 Sampling and analysis
   6.2 Analysis
   6.3 Uncertainties
   6.4 Other
7 Data processing
   7.1 Calculation at the measurement point
   7.2 Balancing and reconciliation
   7.3 Process simulation
   7.4 Line packing and stock change
8 Lift, injection and utility gas
   8.1 General
   8.2 Lift gas
   8.3 Injection gas
   8.4 Utility gas
   8.5 Uncertainty considerations for lift, injection
        and utility gas
9 Uncertainty - General considerations
   9.1 Economic consequences
   9.2 Sensitivity
   9.3 Allocation principle
   9.4 Uncertainty determination
10 Validation
   10.1 General
   10.2 Meter validation
   10.3 Allocation procedures and process validation
   10.4 Data validation
   10.5 Process-model validation
   10.6 Allocation-process results validation
   10.7 Software validation
11 Classification of allocation processes
   11.1 General descriptions and calculations
   11.2 Allocation systems layout
12 Mis-measurements - Measurement-correction and estimations
Annex A (informative) - Adjust for impurities
Annex B (informative) - Adjustments for fuel/utility/vent/flare
        gas
Annex C (informative) - Wet gas
Annex D (informative) - Codes, abbreviations and acronyms
Annex E (informative) - Conversion of molar percent to mass
        percent
Annex F (informative) - Conversion of mole percent to
        percent of the calorific value
Annex G (informative) - Conversion of mole per cent to
        volume percent
Annex H (informative) - Components of gas and liquid
        reported
Bibliography

Explains the production measurements, in terms of both hardware and procedures that can be used to allocate the gas and condensate back to the individual concessions, reservoirs and wells in a fair and equitable way.

This Technical Report describes the production measurements, in terms of both hardware and procedures, that can be used to allocate the gas and condensate back to the individual concessions, reservoirs and wells in a fair and equitable way. The objective is to give an approach that is recognized to be current best practice and that has a wide support in the oil and gas industry.

Committee
CPI/30/2
DocumentType
Standard
Pages
88
PublisherName
British Standards Institution
Status
Current

Standards Relationship
ISO/TR 26762:2008 Identical

ISO 5167-3:2003 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full Part 3: Nozzles and Venturi nozzles
ISO 10715:1997 Natural gas — Sampling guidelines
ISO 6976:2016 Natural gas — Calculation of calorific values, density, relative density and Wobbe indices from composition
ISO 5168:2005 Measurement of fluid flow — Procedures for the evaluation of uncertainties
ISO/IEC Guide 98:1993 Guide to the expression of uncertainty in measurement (GUM)
ISO 6975:1997 Natural gas — Extended analysis — Gas-chromatographic method
ISO 5167-4:2003 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full Part 4: Venturi tubes
ISO 5167-2:2003 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full Part 2: Orifice plates
ISO 5167-1:2003 Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full Part 1: General principles and requirements
ISO 10012:2003 Measurement management systems — Requirements for measurement processes and measuring equipment
ISO 8222:2002 Petroleum measurement systems Calibration Temperature corrections for use when calibrating volumetric proving tanks

View more information
$615.68
Including GST where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more