ES 203 199 : 1.3.1
|
ENVIRONMENTAL ENGINEERING (EE); METHODOLOGY FOR ENVIRONMENTAL LIFE CYCLE ASSESSMENT (LCA) OF INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) GOODS, NETWORKS AND SERVICES
|
EN 300 019-1-3 : 2.4.1
|
ENVIRONMENTAL ENGINEERING (EE); ENVIRONMENTAL CONDITIONS AND ENVIRONMENTAL TESTS FOR TELECOMMUNICATIONS EQUIPMENT; PART 1-3: CLASSIFICATION OF ENVIRONMENTAL CONDITIONS; STATIONARY USE AT WEATHERPROTECTED LOCATIONS
|
ES 205 200-1 : 1.2.1
|
ACCESS, TERMINALS, TRANSMISSION AND MULTIPLEXING (ATTM); ENERGY MANAGEMENT; GLOBAL KPIS; OPERATIONAL INFRASTRUCTURES; PART 1: GENERAL REQUIREMENTS
|
EN 301 605 : 1.1.1
|
ENVIRONMENTAL ENGINEERING (EE); EARTHING AND BONDING OF 400 VDC DATA AND TELECOM (ICT) EQUIPMENT
|
EN 300 132-3 : 1.2.1
|
ENVIRONMENTAL ENGINEERING (EE); POWER SUPPLY INTERFACE AT THE INPUT TO TELECOMMUNICATIONS EQUIPMENT; PART 3: OPERATED BY RECTIFIED CURRENT SOURCE, ALTERNATING CURRENT SOURCE OR DIRECT CURRENT SOURCE UP TO 400 V
|
EN 50600-2-3:2014
|
Information technology - Data centre facilities and infrastructures - Part 2-3: Environmental control
|
ISO 50001:2011
|
Energy management systems Requirements with guidance for use
|
ES 202 336-12 : 1.1.1
|
ENVIRONMENTAL ENGINEERING (EE); MONITORING AND CONTROL INTERFACE FOR INFRASTRUCTURE EQUIPMENT (POWER, COOLING AND BUILDING ENVIRONMENT SYSTEMS USED IN TELECOMMUNICATION NETWORKS); PART 12: ICT EQUIPMENT POWER, ENERGY AND ENVIRONMENTAL PARAMETERS MONITORING INFORMATION MODEL
|
EN 300 132-3-1 : 2.1.1
|
ENVIRONMENTAL ENGINEERING (EE); POWER SUPPLY INTERFACE AT THE INPUT TO TELECOMMUNICATIONS AND DATACOM (ICT) EQUIPMENT; PART 3: OPERATED BY RECTIFIED CURRENT SOURCE, ALTERNATING CURRENT SOURCE OR DIRECT CURRENT SOURCE UP TO 400 V; SUB-PART 1: DIRECT CURRENT SOURCE UP TO 400 V
|
EN 50600-1:2012
|
INFORMATION TECHNOLOGY - DATA CENTRE FACILITIES AND INFRASTRUCTURES - PART 1: GENERAL CONCEPTS
|
GS OEU 001 : 2.1.1
|
OPERATIONAL ENERGY EFFICIENCY FOR USERS (OEU); GLOBAL KPIS FOR ICT SITES
|
ISO 14044:2006
|
Environmental management Life cycle assessment Requirements and guidelines
|
TS 103 199 : 1.1.1
|
ENVIRONMENTAL ENGINEERING (EE); LIFE CYCLE ASSESSMENT (LCA) OF ICT EQUIPMENT, NETWORKS AND SERVICES; GENERAL METHODOLOGY AND COMMON REQUIREMENTS
|
ES 203 237 : 1.1.1
|
ENVIRONMENTAL ENGINEERING (EE); GREEN ABSTRACTION LAYER (GAL); POWER MANAGEMENT CAPABILITIES OF THE FUTURE ENERGY TELECOMMUNICATION FIXED NETWORK NODES
|
ISO 14045:2012
|
Environmental management — Eco-efficiency assessment of product systems — Principles, requirements and guidelines
|
ES 202 336-9 : 1.1.1
|
ENVIRONMENTAL ENGINEERING (EE); MONITORING AND CONTROL INTERFACE FOR INFRASTRUCTURE EQUIPMENT (POWER, COOLING AND BUILDING ENVIRONMENT SYSTEMS USED IN TELECOMMUNICATION NETWORKS); PART 9: ALTERNATIVE POWER SYSTEMS
|
ISO 14040:2006
|
Environmental management Life cycle assessment Principles and framework
|
TR 102 489 : 1.4.1
|
ENVIRONMENTAL ENGINEERING (EE); EUROPEAN TELECOMMUNICATIONS STANDARD FOR EQUIPMENT PRACTICE; THERMAL MANAGEMENT GUIDANCE FOR EQUIPMENT AND ITS DEPLOYMENT
|
ES 205 200-3 : 1.0.0 FINAL DRAFT
|
ACCESS, TERMINALS, TRANSMISSION AND MULTIPLEXING (ATTM); ENERGY MANAGEMENT; GLOBAL KPIS; OPERATIONAL INFRASTRUCTURES; PART 3: GLOBAL KPIS FOR ICT SITES
|