Customer Support: 131 242

  • There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

XP P98 772-2 : 2004 XP

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - DATA ACQUISITION MODULES FOR GRANULAR MIX FABRICATION PLANTS - DESCRIPTION AND FUNCTIONAL SPECIFICATIONS - PART 2: DISCONTINUOUS PRODUCTION MODULE

Superseded date

01-12-2013

Published date

12-01-2013

DevelopmentNote
Indice de classement: P98-772-2XP. PR NFP 98 772-2 July 2003. XP P98 772-2 August 2004. (07/2003) Supersedes NFP 98 772. (10/2004)
DocumentType
Miscellaneous Product
PublisherName
Association Francaise de Normalisation
Status
Superseded
SupersededBy
Supersedes

NFP 98 744-3 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 3: AGGREGATE VOLUMETRIC DOSING MACHINE
NFP 98 744-7 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 7: POWDER WEIGHING DOSING MACHINE WITH TOTAL WEIGHED SCREW - SUBSTANCE WEIGHING TEST
NFP 98 744-1 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 1: BELT FLOW METER FOR BELT CONVEYOR
NFP 98 744-2 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 2: AGGREGATE WEIGHING DOSING MACHINE
NFP 98 744-4 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 4: DRY BULK WEIGHING DOSING MACHINE - BELT SAMPLING TEST
NFP 98 744-5 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 5: DRY BULK WEIGHING DOSING MACHINE - SUBSTANCE WEIGHING TEST

NFP 98 701 : 1993 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - MATERIAL PROCESSING PLANTS - TERMINOLOGY AND PERFORMANCES
NFP 98 149 : 2000 ASPHALT - TERMINOLOGY - COMPONENTS AND COMPOSITION OF MIXTURES - IMPLEMENTATION - PRODUCTS - TECHNIQUES AND PROCESSES
NFP 98 744-2 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 2: AGGREGATE WEIGHING DOSING MACHINE
NFP 98 744-3 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 3: AGGREGATE VOLUMETRIC DOSING MACHINE
NFP 98 744-1 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 1: BELT FLOW METER FOR BELT CONVEYOR
NFP 98 744-5 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 5: DRY BULK WEIGHING DOSING MACHINE - SUBSTANCE WEIGHING TEST
XP P98 142-1 : 2003 XP ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - MANUFACTURE OF MIXTURES - PART 1: PRODUCTION CONTROL OF HOT MIX ASPHALTS USING A DATA ACQUISITION SYSTEM
NFC 93 425 : 81 AMD 1 83 ELECTRONIC COMPONENTS. CONNECTING DEVICES - MULTIPLE CONNECTORS WITH SHELL FOR RACKS AND PANELS - GENERAL REQUIREMENTS
NFP 98 115 : 2009 ROAD FOUNDATIONS - CONSTRUCTION OF PAVEMENT STRUCTURES - COMPONENTS - MIX COMPONENTS AND FORMULAE - PERFORMANCE AND CONTROL
NFP 98 150 : 1992 BITUMINOUS ASPHALT - LAYING OF BASE, BINDER AND SURFACE COURSES - COMPONENTS - MIX CONTENTS - PERFORMANCE AND CHECKS
NFP 98 744-4 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 4: DRY BULK WEIGHING DOSING MACHINE - BELT SAMPLING TEST
NFP 98 728-1 : 2013 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - HOT MIX ASPHALT PRODUCTION FACILITIES - DEFINITION OF CONSTITUENT EQUIPMENT AND CHARACTERISTICS, VERIFICATION OF INITIAL SETTINGS - PART 1: BITUMINOUS MIXTURE CONTINUOUS MODE PRODUCTION FACILITIES
NFP 98 728-2 : 2013 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - HOT MIX ASPHALT PRODUCTION FACILITIES - DEFINITION OF CONSTITUENT EQUIPMENT AND CHARACTERISTICS, VERIFICATION OF INITIAL SETTINGS - PART 2 : BITUMINOUS MIXTURE DISCONTINUOUS MODE PRODUCTION FACILITIES
NFP 98 744-6 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 6: ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS ASPHALT DOSING APPARATUS

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Need help?
Call us on 131 242, then click here to start a Screen Sharing session
so we can help right away! Learn more