00/200941 DC : DRAFT FEB 2000

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

IEC 61935-2 - GENERIC CABLING SYSTEMS - SPECIFICATION FOR THE TESTING OF BALANCED COMMUNICATION CABLING IN ACCORDANCE WITH ISO/IEC 11801 - PART 2: PATCH CORDS AND WORK AREA CABLING

Superseded date

07-11-2003

Published date

23-11-2012

1 Scope
2 Normative references
3 Definitions
4 Inspection of workmanship and connectivity testing
   4.1 Visual inspection
   4.2 Wire Map
5 Propagation delay and delay skew
6 Insertion loss
   6.1 Object
   6.2 Procedure
   6.3 Requirements
7 Return loss
   7.1 Object
   7.2 Test method
   7.3 Test set up
        7.3.1 Reference plug
        7.3.2 Reference Jack
   7.4 Procedure
        7.4.1 Calibration
        7.4.2 Measurement
   7.5 Test report
   7.6 Accuracy of return loss measurements
   7.7 Requirements
8 Coupling attenuation
9 Next
   9.1 Modular Plug Cord Next Loss Limits
   9.2 Modular Plug Cord Test Procedure
        9.2.1 Network analyzer test configuration
10 Tensile
   10.1 Object
   10.2 Procedure
   10.3 Requirements
   10.4 Information to be given in the detail
        specification
11 Flexure
   11.1 Object
   11.2 Procedure
   11.3 Requirements
   11.4 Information to be given in the detail
        specification
12 Bending/Twisting
   12.1 Object
   12.2 Procedures
        12.2.1 Bending
        12.2.2 Twisting
   12.3 Requirements
13 Crushing
   13.1 Object
   13.2 Procedure
   13.3 Requirements
   13.4 Information to be given in the detail
        specification
14 Dust test
   14.1 Object
   14.2 Procedure
   14.3 Requirements
   14.4 Information to be given in the DS
   14.5 Test chamber
15 Climatic sequence
   15.1 Object
   15.2 Procedure
   15.3 Requirements
   15.4 Information to be given in the detail
        specification

Committee
EPL/46/1
DocumentType
Draft
PublisherName
British Standards Institution
Status
Superseded
SupersededBy

IEC 60603-7-1:2011 Connectors for electronic equipment - Part 7-1: Detail specification for 8-way, shielded, free and fixed connectors
IEC 60068-2-68:1994 Environmental testing - Part 2-68: Tests - Test L: Dust and sand
IEC 60603-7:2008+AMD1:2011 CSV Connectors for electronic equipment - Part 7: Detail specification for 8-way, unshielded, free and fixed connectors
IEC 61935-1:2015 Specification for the testing of balanced and coaxial information technology cabling - Part 1: Installed balanced cabling as specified in ISO/IEC 11801 and related standards
IEC 61156-1:2007+AMD1:2009 CSV Multicore and symmetrical pair/quad cables for digital communications - Part 1: Generic specification
IEC 60068-2-61:1991 Environmental testing - Part 2-61: Test methods - Test Z/ABDM:Climatic sequence

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.