• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

AS 4391-1999

Current
Current

The latest, up-to-date edition.

Smoke management systems - Hot smoke test (Reconfirmed 2016)
Available format(s)

Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English

Published date

05-01-1999

Preview

Sets out a hot smoke test methodology by means of which a specified quantity of smoke may be generated, at a safe temperature, within a building. Test apparatus, procedures and safety requirements for the hot smoke testing of smoke management systems are detailed. The size of test fire is selected to generate the required quantity of smoke at a safe temperature.

This Standard sets out the means by which a specified quantity of smoke may be generated, at a safe temperature, within a building. It details test apparatus, procedures and safety requirements for the hot smoke testing of smoke management systems. The size of test fire is selected to generate the required quantity of smoke at a safe temperature.C1.1 The size of test fires specified in this Standard varies from areas of 0.03 m2to 2 m2. It is, therefore, possible to apply a hot plume in a compartment of any size without causing damage. It is recommended that a hot smoke test be utilized whenever a smoke test is considered necessary.

Committee
ME/62
DocumentType
Standard
ISBN
0 7337 2371 3
Pages
25
ProductNote
Reconfirmed 27/05/2016.This standard has been reconfirmed in Australia in 2016 and remains current in New Zealand. Reconfirmation Notice 27/05/2016
PublisherName
Standards Australia
Status
Current
Supersedes

First published as AS/NZS 4391(Int):1996.Revised and designated AS 4391-1999.Reconfirmed 2016. Originated as AS/NZS 4391(Int):1996. Revised and designated AS 4391-1999.

BS ISO/TR 13387-5:1999 Fire safety engineering Movement of fire effluents
AS 1221-1991 Fire hose reels
VDI 6019 Blatt 1:2006-05 Engineering procedure for the dimensioning of the smoke derivative from buildings - Fire curves, verification of the effectiveness
AS/NZS 1716:1994 Respiratory protective devices
AS/NZS 1715:1994 Selection, use and maintenance of respiratory protective devices
AS/NZS 1668.1:1998 The use of ventilation and airconditioning in buildings Fire and smoke control in multi-compartment buildings

AS 4825-2011 Tunnel fire safety
AS 1668.3-2001 The use of ventilation and airconditioning in buildings Smoke control systems for large single compartments or smoke reservoirs

View more information
£57.88
Excluding VAT

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.