1 - AS/NZS 1839:1994 SWIMMING POOLS - PREMOULDED FIBRE-REINFORCED PLASTICS - INSTALLATION
4 - PREFACE
4 - CONTENTS
5 - 1 SCOPE
5 - 2 REFERENCED DOCUMENTS
5 - 3 STORAGE, HANDLING AND TRANSPORT OF POOLS
6 - 4 INSTALLATION CRITERIA
6 - 4.1 Condition of the pool at the point of delivery
6 - 4.2 Imposed loads
6 - 4.3 Bottom load
6 - 4.4 Movement of sub-surface water
6 - 5 MATERIALS
6 - 5.1 Bedding
6 - 5.2 Backfill
6 - 6 EXCAVATION FOR POOLS IN THE GROUND
6 - 6.1 Support during excavation
6 - 6.2 Excavation profile
7 - 7 INSTALLATION OF POOLS IN THE GROUND
7 - 7.1 Deflection limits
7 - 7.2 Pool drainage
8 - 7.3 Site work
8 - 7.4 Placement and backfilling of pool
8 - 7.5 Final level of pool
8 - 7.6 Concrete bond beam
8 - 8 INSTALLATION OF POOLS ABOVE THE GROUND
8 - 8.1 General
9 - 8.2 Base preparation
9 - 8.3 Bedding
9 - 8.4 Final level of pool
9 - 9 POOL-ASSOCIATED SERVICES
9 - 9.1 Electrical connections
9 - 9.2 Plumbing
9 - 9.3 Skimmer boxes
9 - 9.4 Fencing (for New Zealand application only)
9 - 10 OPERATING INSTRUCTIONS