Foreword
Committees responsible
Code of practice
1 Scope
2 Definitions
3 Planning
3.1 Consultation
3.2 Time schedule
3.3 Survey
3.4 System design
4 Installation
4.1 General
4.2 Detectors
4.3 Control equipment
4.4 Warning devices
4.5 Interconnecting wiring
4.6 Power supply
4.7 Commissioning and handover of the installed system
Figures
1 Directly attached continuous wiring (configuration 1)
2 Directly attached continuous wiring (configuration II)
3 Use of blockboard
4 Use of timber battens
5 Recommended configurations for foil