BS 6164:1990
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
Code of practice for safety in tunnelling in the construction industry
Hardcopy , PDF
07-12-2001
English
30-04-1990
Committees responsible
Foreword
Section one. General
1 Scope
2 Definitions
3 Legislation
Section two. Planning and organization
4 Organization and administration
5 Information and investigation
6 Contingency planning
7 Excavation and initial support
8 Management of water
9 Permanent support
10 Compressed air working
Section three. Emergencies
11 Flooding
12 Methane
13 Fire prevention
14 Fire fighting and rescue
Section four. Working environment
15 Ventilation
16 Dust
17 Quality of illumination
Section five. Communications and noise
18 Operating communications
19 Noise
Section six. Access and transport
20 Shafts
21 Lifting equipment
22 Access tunnels
23 Transport
Section seven. Plant and equipment
24 Electrical
25 Miscellaneous tunnel plant
Section eight. Maintenance, renovation and repair
26 Maintenance, renovation and repair
Appendices
A Types of timbered heading
B Details of working a close timbered face for a 3.5 m
internal diameter segmental lined tunnel without
shield
C Working a hand shield with a fully timbered face
Tables
1 Principal causes of accidents
2 Methods of initial ground support
3 Choice of fire extinguishing equipment
4 Summary of the most commonly encountered dangerous
gases
5 Earth leakage protection
Figures
1 Working a 4 m outside diameter tunnelling shield
2 General arrangement of pipe jacking equipment
3 Initial support in a rock tunnel
4 Patch refacing of brickwork using straps, hooks and
laggings
5 Tunnel lining renewal or refacing using timber
lagging, centres and steel ribs
6 Tunnel lining renewal or refacing using full ribbing
systems
7 Details of brick tunnel arch replacement
8 Piled (poled) heading: headboard ready for driving
9 Piled (poled) heading: headboards driven as far as
possible
10 Piled (poled) heading: headboards driven to full
length
11 Timber settings
12 Timbered box heading
13 Timbering details
14 Full close timbered vertical boards suitable for a
clay face in a 3.5 m internal diameter lined tunnel
15 Full timbering using horizontal boards suitable for
a sand or gravel face in 3.5 m internal diameter
lined tunnel
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.