BS ISO 16571:2014
Current
The latest, up-to-date edition.
Hardcopy , PDF
English
31-05-2014
Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 General requirements
5 Design requirements
6 Indicating systems
7 Plume extraction system pipeline
8 System components
9 Terminal units
10 Marking and colour coding
11 Pipeline installation
12 Testing, commissioning, and certification of
the PES
13 Information to be supplied by the manufacturer
Annex A (informative) - Types of plume evacuation
systems
Annex B (informative) - Healthcare facility policies
and procedures
Annex C (informative) - Typical plume capture
devices and transfer tubings
Annex D (informative) - Risk management checklist
Annex E (informative) - Operational management
Annex F (informative) - Rationale
Annex G (informative) - Example of procedure for
testing and commissioning
for a central system
Annex H (informative) - Guidelines for flow-generating
devices consisting of fans or blowers
Bibliography
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.