• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

BS PD IEC TS 60076-19 : 2013

Superseded
Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

POWER TRANSFORMERS - PART 19: RULES FOR THE DETERMINATION OF UNCERTAINTIES IN THE MEASUREMENT OF THE LOSSES ON POWER TRANSFORMERS AND REACTORS
Available format(s)

Hardcopy , PDF

Superseded date

31-01-2016

Language(s)

English

Published date

01-01-2013

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols
5 Power measurement, systematic deviation and uncertainty
6 Procedures for no-load loss measurement
7 Procedures for load loss measurement
8 Three-phase calculations
9 Reporting
10 Estimate of corrections and uncertainty contributions
Annex A (informative) - Example of load loss uncertainty
        evaluation for a large power transformer
Annex B (Informative) - Example of load loss uncertainty
        evaluation for a distribution transformer
Bibliography

Describes the procedures that should be applied to evaluate the uncertainty affecting the measurements of no-load and load losses during the routine tests on power transformers.

Committee
PEL/14
DevelopmentNote
Supersedes 12/30267005 DC. (04/2013) Renumbered and superseded by BS EN 60076-19. (02/2016)
DocumentType
Standard
Pages
42
PublisherName
British Standards Institution
Status
Superseded
SupersededBy
Supersedes

Standards Relationship
IEC TS 60076-19:2013 Identical

ISO/IEC 17025:2005 General requirements for the competence of testing and calibration laboratories
IEC 61869-3:2011 Instrument transformers - Part 3: Additional requirements for inductive voltage transformers
IEC 61869-2:2012 Instrument transformers - Part 2: Additional requirements for current transformers
IEC 61869-1:2007 Instrument transformers - Part 1: General requirements
IEC 60076-8:1997 Power transformers - Part 8: Application guide
IEC 60076-1:2011 Power transformers - Part 1: General
IEEE C57.123-2010 REDLINE IEEE Guide for Transformer Loss Measurement
IEC 60076-2:2011 Power transformers - Part 2: Temperature rise for liquid-immersed transformers
ISO/IEC Guide 98-3:2008 Uncertainty of measurement — Part 3: Guide to the expression of uncertainty in measurement (GUM:1995)

View more information
£218.00
Excluding VAT

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.