• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

CEN/TR 16369:2012

Current

Current

The latest, up-to-date edition.

Use of control charts in the production of concrete

Published date

03-10-2012

Foreword
Introduction
1 Scope
2 Symbols and abbreviations
3 Statistics for Concrete
4 Simple Data Charts
5 Shewhart Charts
6 CUSUM
7 Multivariable and Multigrade Analysis
8 Speeding the Response of the System
9 Guidance on Control Systems
10 EN 206-1 Conformity Rules for Compressive
   Strength
11 Implementing Control Systems
12 CUSUM Example
Bibliography

This Technical Report reviews various control systems that are currently used in the concrete industry and, by the use of examples, show how the principles are applied to control the production of concrete. This CEN/TR provides information and examples of the use of method C in Clause 8 of prEN 206:2012.

Committee
CEN/TC 104
DocumentType
Technical Report
PublisherName
Comite Europeen de Normalisation
Status
Current

BS EN 206 : 2013 CONCRETE - SPECIFICATION, PERFORMANCE, PRODUCTION AND CONFORMITY
DIN EN 206:2014-07 CONCRETE - SPECIFICATION, PERFORMANCE, PRODUCTION AND CONFORMITY
EN 206:2013+A1:2016 Concrete - Specification, performance, production and conformity

BS 5700:1984 Guide to process control using quality control chart methods and cusum techniques
ISO 7966:1993 Acceptance control charts
EN 206-1:2000/A2:2005 CONCRETE - PART 1: SPECIFICATION, PERFORMANCE, PRODUCTION AND CONFORMITY
ISO/TR 7871:1997 Cumulative sum charts Guidance on quality control and data analysis using CUSUM techniques

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.