DD IEC/TS 61934:2011
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
Electrical insulating materials and systems. Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses
Hardcopy , PDF
30-01-2024
English
30-06-2011
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Measurement of partial discharge pulses during repetitive,
short rise-time voltage impulses and comparison with
power frequency
5 PD detection methods
6 Measuring instruments
7 Sensitivity check of the PD measuring equipment
8 Test procedure for increasing and decreasing the repetitive
impulse voltage magnitude
9 Test report
Annex A (informative) - Voltage impulse suppression required
by the coupling device
Annex B (informative) - PD pulses extracted from a supply
voltage impulse through filtering techniques
Annex C (informative) - Result of round-robin tests of RPDIV
measurement
Annex D (informative) - Examples of noise levels of practical
PD detectors
Bibliography
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.