DEFSTAN 03-032(PT1)/5(2017) : 2017
Current
The latest, up-to-date edition.
PRETREATMENT AND PAINTING OF VEHICLES, ENGINEER EQUIPMENT AND COMPONENTS - PART 1: GENERAL REQUIREMENTS
Hardcopy , PDF
English
14-06-2017
0 Introduction
1 Scope
2 General Requirements
3 Process Schedule
4 Surface Preparation
5 Heat treatment
6 Paint and painting requirements
7 Paint, Pre-treatment Primer (Etching Primer)
8 Drying
9 Paint Film Thickness
10 Post-painting Procedures
11 Withdrawn, Replaced or Obsolescent Systems
Annex A - Preferred Format for Process Schedule
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.