EI GUIDE MGMT. INTEGRITY SUBSEA : 1ED 2009
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
GUIDELINES FOR THE MANAGEMENT OF INTEGRITY OF SUBSEA FACILITIES
23-07-2013
12-01-2013
Foreword
Acknowledgements
PART A - MANAGEMENT POLICY
A1 Introduction
A2 Key principles
A3 Outline of the integrity management process
A4 Management processes
A5 Roles and responsibilities, documentation and reports
PART B - DETAILED GUIDANCE
B1 Introduction
B2 Scope
B3 Application
B4 Legislative framework
B5 Integrity management schemes, teams and responsibilities
B6 Definition and sub-division of the system
B7 Considerations at the project stage
B8 Risk-based integrity management
B9 Process and condition monitoring
B10 In-service inspection
B11 Information management
B12 Maintainability, spares and preparedness
B13 Audit and review
B14 Related processes
Annex A - Alternative host arrangements
Annex B - Checklist of subsea facility components
Annex C - References
Annex D - Glossary and abbreviations
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.