EN IEC 62439-3:2018

Superseded
Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)
Superseded date

21-02-2022

Published date

02-02-2018

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions, abbreviations, acronyms,
  and conventions
4 Parallel Redundancy Protocol (PRP)
5 High-availability Seamless Redundancy (HSR)
6 Protocol Implementation Conformance
  Statement (PICS)
7 PRP/HSR Management Information Base (MIB)
Annex A (normative) - Clocks synchronization over
        redundant paths in IEC 62439-3
Annex B (normative) - PTP profile for Power Utility
        Automation - Redundant clock attachment
Annex C (normative) - PTP profiles for high-availability
        automation networks
Annex D (informative) - Precision Time Protocol
        tutorial for IEC 62439-3
Annex E (normative) - Management Information base
        for singly and doubly attached clocks
Bibliography
Annex ZA (normative) - Normative references to
         international publications with their
         corresponding European publications

IEC 62439-3:2016 is available as IEC 62439-3:2016RLV which contains the International Standard and its Redlineversion, showing all changes of the technical content compared tothe previous edition.IEC 62439-3:2016 is applicable to high-availability automation networks based on the Ethernet technology. This part of IEC 62439 specifies two redundancy protocols designed to provide seamless recovery in case of single failure of an inter-bridge link or bridge in the network, which are based on the same scheme: parallel transmission of duplicated information. This third edition cancels and replaces the second edition published in 2012. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition:- technical corrections and extension of specifications;- consideration of IEC 61588 clock synchronization with end-to-end delay measurement alongside the existing peer-to-peer delay measurement in PRP.

Committee
CLC/TC 65X
DevelopmentNote
Supersedes & Redesignates EN 62439-3. (03/2018)
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Superseded
SupersededBy
Supersedes

ISO/IEC 9646-7:1995 Information technology Open Systems Interconnection Conformance testing methodology and framework Part 7: Implementation Conformance Statements
EN 62439-1:2010/A2:2017 INDUSTRIAL COMMUNICATION NETWORKS - HIGH AVAILABILITY AUTOMATION NETWORKS - PART 1: GENERAL CONCEPTS AND CALCULATION METHODS (IEC 62439-1:2010/A2:2016)
IEEE 802.1Q-2014 IEEE Standard for Local and metropolitan area networks--Bridges and Bridged Networks
IEEE 802.1D-2004 IEEE Standard for Local and metropolitan area networks: Media Access Control (MAC) Bridges
IEC 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
IEC 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
IEC 61588:2009 Precision clock synchronization protocol for networked measurement and control systems
IEC 62439-1:2010+AMD1:2012+AMD2:2016 CSV Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods
IEC 62439-6:2010 Industrial communication networks - High availability automation networks - Part 6: Distributed Redundancy Protocol (DRP)
ISO/IEC 8802-2:1998 Information technology Telecommunications and information exchange between systems Local and metropolitan area networks Specific requirements Part 2: Logical link control
IEC 62439-2:2016 Industrial communication networks - High availability automation networks - Part 2: Media Redundancy Protocol (MRP)
ISO/IEC/IEEE 8802-3:2017 Information technology Telecommunications and information exchange between systems Local and metropolitan area networks Specific requirements Part 3: Standard for Ethernet
IEC 62439-7:2011 Industrial communication networks - High availability automation networks - Part 7: Ring-based Redundancy Protocol (RRP)

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.