I.S. EN 12952-5:2011
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 5: WORKMANSHIP AND CONSTRUCTION OF PRESSURE PARTS OF THE BOILER
Hardcopy , PDF
27-01-2022
English
01-01-2011
For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.
Only cited Standards give presumption of conformance to New Approach Directives/Regulations.
Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols and abbreviations
5 General
6 Pressure part
7 Cutting, forming and fabrication tolerances
8 Welding
9 Mechanical connections
10 Thermal treatment
Annex A (normative) - Tube bending procedure tests
Annex B (informative) - Welded pressure connections
and non-pressure containing attachments
Annex C (normative) - Manufacture of welded
tubewalls
Annex D (normative) - Coiled boilers and coiled
superheaters
Annex E (normative) - Special requirements for
composite tubes
Annex F (informative) - Guidelines for the determination
of the competency of boiler manufacturers
Annex G (informative) - Significant technical changes
between this European Standard and the
previous edition
Annex ZA (informative) - Relationship between this
European Standard and the Essential Requirements
of EU Directive 97/23/EC
Bibliography
Gives requirements for the workmanship and construction of water-tube boilers as defined in EN 12952-1.
DocumentType |
Standard
|
Pages |
91
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Superseded
|
SupersededBy | |
Supersedes |
Standards | Relationship |
ONORM EN 12952-5 : 2011 | Identical |
UNI EN 12952-5 : 2011 | Identical |
BS EN 12952-5:2011 | Identical |
SN EN 12952-5 : 2012 | Identical |
NEN EN 12952-5 : 2011 | Identical |
NS EN 12952-5 : 2011 | Identical |
UNE-EN 12952-5:2012 | Identical |
NBN EN 12952-5 : 2011 | Identical |
EN 12952-5:2011 | Identical |
NF EN 12952-5 : 2011 | Identical |
DIN EN 12952-5:2012-01 | Identical |
ISO/TR 20172:2009 | Welding Grouping systems for materials European materials |
ISO 14555:2017 | Welding — Arc stud welding of metallic materials |
EN ISO 9692-1:2013 | Welding and allied processes - Types of joint preparation - Part 1: Manual metal arc welding, gas-shielded metal arc welding, gas welding, TIG welding and beam welding of steels (ISO 9692-1:2013) |
EN ISO 6520-1:2007 | Welding and allied processes - Classification of geometric imperfections in metallic materials - Part 1: Fusion welding (ISO 6520-1:2007) |
EN ISO 17663:2009 | Welding - Quality requirements for heat treatment in connection with welding and allied processes (ISO 17663:2009) |
EN ISO 3834-3:2005 | Quality requirements for fusion welding of metallic materials - Part 3: Standard quality requirements (ISO 3834-3:2005) |
EN ISO 5817:2014 | Welding - Fusion-welded joints in steel, nickel, titanium and their alloys (beam welding excluded) - Quality levels for imperfections (ISO 5817:2014) |
ISO 6520-1:2007 | Welding and allied processes Classification of geometric imperfections in metallic materials Part 1: Fusion welding |
EN ISO 3834-2:2005 | Quality requirements for fusion welding of metallic materials - Part 2: Comprehensive quality requirements (ISO 3834-2:2005) |
ISO 8501-1:2007 | Preparation of steel substrates before application of paints and related products — Visual assessment of surface cleanliness — Part 1: Rust grades and preparation grades of uncoated steel substrates and of steel substrates after overall removal of previous coatings |
EN 1708-1:2010 | Welding - Basic welded joint details in steel - Part 1: Pressurized components |
EN ISO 9692-2:1998/AC:1999 | WELDING AND ALLIED PROCESSES - JOINT PREPARATION - PART 2: SUBMERGED ARC WELDING OF STEELS |
ISO 23277:2015 | Non-destructive testing of welds Penetrant testing Acceptance levels |
EN ISO 15613:2004 | Specification and qualification of welding procedures for metallic materials - Qualification based on pre-production welding test (ISO 15613:2004) |
EN ISO 6892-1:2016 | Metallic materials - Tensile testing - Part 1: Method of test at room temperature (ISO 6892-1:2016) |
ISO 4759-1:2000 | Tolerances for fasteners — Part 1: Bolts, screws, studs and nuts — Product grades A, B and C |
EN 1759-1:2004 | Flanges and their joint - Circular flanges for pipes, valves, fittings and accessories, Class designated - Part 1: Steel flanges, NPS 1/2 to 24 |
ISO/TR 15608:2017 | Welding Guidelines for a metallic materials grouping system |
ISO 6892-1:2016 | Metallic materials Tensile testing Part 1: Method of test at room temperature |
EN 1011-1:2009 | Welding - Recommendations for welding of metallic materials - Part 1: General guidance for arc welding |
EN 12952-3:2011 | Water-tube boilers and auxiliary installations - Part 3: Design and calculation for pressure parts of the boiler |
ISO 14731:2006 | Welding coordination Tasks and responsibilities |
EN 12952-4:2011 | Water-tube boilers and auxiliary installations - Part 4: In-service boiler life expectancy calculations |
ISO 17663:2009 | Welding — Quality requirements for heat treatment in connection with welding and allied processes |
EN ISO 4063:2010 | Welding and allied processes - Nomenclature of processes and reference numbers (ISO 4063:2009, Corrected version 2010-03-01) |
EN ISO 23278 : 2015 | NON-DESTRUCTIVE TESTING OF WELDS - MAGNETIC PARTICLE TESTING - ACCEPTANCE LEVELS (ISO 23278:2015) |
EN ISO 23277:2015 | Non-destructive testing of welds - Penetrant testing - Acceptance levels (ISO 23277:2015) |
EN 10216-2:2013 | Seamless steel tubes for pressure purposes - Technical delivery conditions - Part 2: Non-alloy and alloy steel tubes with specified elevated temperature properties |
EN 473:2008 | Non-destructive testing - Qualification and certification of NDT personnel - General principles |
ISO 23278:2015 | Non-destructive testing of welds Magnetic particle testing Acceptance levels |
EN 12952-7:2012 | Water-tube boilers and auxiliary installations - Part 7: Requirements for equipment for the boiler |
EN 10028-2:2017 | Flat products made of steels for pressure purposes - Part 2: Non-alloy and alloy steels with specified elevated temperature properties |
EN 10253-4:2008/AC:2009 | BUTT-WELDING PIPE FITTINGS - PART 4: WROUGHT AUSTENITIC AND AUSTENITIC-FERRITIC (DUPLEX) STAINLESS STEELS WITH SPECIFIC INSPECTION REQUIREMENTS |
EN 1011-2:2001/A1:2003 | WELDING - RECOMMENDATIONS FOR WELDING OF METALLIC MATERIALS - PART 2: ARC WELDING OF FERRITIC STEELS |
ISO 148-1:2016 | Metallic materials — Charpy pendulum impact test — Part 1: Test method |
EN 12952-1:2015 | Water-tube boilers and auxiliary installations - Part 1: General |
ISO 5817:2014 | Welding — Fusion-welded joints in steel, nickel, titanium and their alloys (beam welding excluded) — Quality levels for imperfections |
ISO 9692-1:2013 | Welding and allied processes — Types of joint preparation — Part 1: Manual metal arc welding, gas-shielded metal arc welding, gas welding, TIG welding and beam welding of steels |
ISO 15614-1:2017 | Specification and qualification of welding procedures for metallic materials — Welding procedure test — Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloys |
EN ISO 4759-1 : 2000 | TOLERANCES FOR FASTENERS - PART 1: BOLTS, SCREWS, STUDS AND NUTS - PRODUCT GRADES A, B AND C |
ISO 3834-2:2005 | Quality requirements for fusion welding of metallic materials Part 2: Comprehensive quality requirements |
EN ISO 9001:2015 | Quality management systems - Requirements (ISO 9001:2015) |
EN ISO 14731:2006 | Welding coordination - Tasks and responsibilities (ISO 14731:2006) |
EN 10204:2004 | Metallic products - Types of inspection documents |
CEN ISO/TR 15608:2017 | Welding - Guidelines for a metallic materials grouping system (ISO/TR 15608:2017) |
EN 10025-2:2004/AC:2005 | HOT ROLLED PRODUCTS OF STRUCTURAL STEELS - PART 2: TECHNICAL DELIVERY CONDITIONS FOR NON-ALLOY STRUCTURAL STEELS |
ISO 9001:2015 | Quality management systems — Requirements |
ISO 9000:2015 | Quality management systems — Fundamentals and vocabulary |
ISO 9692-2:1998 | Welding and allied processes — Joint preparation — Part 2: Submerged arc welding of steels |
EN ISO 8501-1:2007 | Preparation of steel substrates before application of paints and related products - Visual assessment of surface cleanliness - Part 1: Rust grades and preparation grades of uncoated steel substrates and of steel substrates after overall removal of previous coatings (ISO 8501-1:2007) |
ISO 15613:2004 | Specification and qualification of welding procedures for metallic materials Qualification based on pre-production welding test |
EN ISO 148-1:2016 | Metallic materials - Charpy pendulum impact test - Part 1: Test method (ISO 148-1:2016) |
ISO 4063:2009 | Welding and allied processes — Nomenclature of processes and reference numbers |
EN ISO 14555:2017 | Welding - Arc stud welding of metallic materials (ISO 14555:2017) |
EN 571-1:1997 | Non destructive testing - Penetrant testing - Part 1: General principles |
EN ISO 17638:2016 | Non-destructive testing of welds - Magnetic particle testing (ISO 17638:2016) |
EN 1418:1997 | Welding personnel - Approval testing of welding operators for fusion welding and resistance weld setters for fully mechanized and automatic welding of metallic materials |
ISO 13916:2017 | Welding — Measurement of preheating temperature, interpass temperature and preheat maintenance temperature |
EN 12952-2:2011 | Water-tube boilers and auxiliary installations - Part 2: Materials for pressure parts of boilers and accessories |
CEN ISO/TR 20172:2009 | Welding - Grouping systems for materials - European materials (ISO/TR 20172:2009) |
ISO 17638:2016 | Non-destructive testing of welds Magnetic particle testing |
ISO 3834-3:2005 | Quality requirements for fusion welding of metallic materials Part 3: Standard quality requirements |
EN ISO 9000:2015 | Quality management systems - Fundamentals and vocabulary (ISO 9000:2015) |
EN 10253-2:2007 | Butt-welding pipe fittings - Part 2: Non alloy and ferritic alloy steels with specific inspection requirements |
EN 1708-2:2000 | Welding - Basic weld joint details in steel - Part 2: Non internal pressurized components |
EN 287-1:2011 | Qualification test of welders - Fusion welding - Part 1: Steels |
EN 12952-6:2011 | Water-tube boilers and auxiliary installations - Part 6: Inspection during construction; documentation and marking of pressure parts of the boiler |
Please Login or Create an Account so you can add users to your Multi user PDF Later.
Important note : All end users must be registered with an Account prior to user licenses being assigned.
Users cannot be edited or removed once added to your Multi user PDF.
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.