GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 5-2: GAS TURBINES
Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-1998

Preview

For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.

Only cited Standards give presumption of conformance to New Approach Directives/Regulations.

Foreword
1 Scope
2 Normative references
3 Definitions
    3.1 Organizational terms
    3.2 Technical terms
    3.3 General terms Page
4 Brief overall project description
    4.1 Role and organization of purchaser
    4.2 Site location
    4.3 Equipment task
    4.4 Equipment to be purchased
    4.5 Control and instrumentation
    4.6 Electrical supplies and other services
    4.7 Other interfaces
    4.8 Project programme
    4.9 Equipment identification systems
5 Extent of supply
6 Terminal points
7 Operational requirements
    7.1 Operating environment
    7.2 Manning levels
    7.3 Normal operation
    7.4 Operating hours
    7.5 Start-up and shut-down
    7.6 Abnormal conditions
    7.7 Further operational requirements
8 Life expectancy
    8.1 Design life
    8.2 Components requiring periodic maintenance
9 Performance requirements
    9.1 Duty
    9.2 Performance
    9.3 Equipment margins
    9.4 Availability
    9.5 Levels of component redundancy
    9.6 Further performance requirements
10 Design and fabrication
    10.1 Specific equipment features
    10.2 Design justification
    10.3 Material selection
    10.4 Safety
    10.5 Interchangeability
    10.6 Fabrication methods
11 Maintenance requirements
    11.1 Planned maintenance
    11.2 Personnel safety
    11.3 Requirements for access
    11.4 Lifting requirements
    11.5 Special tools
    11.6 Test equipment
    11.7 Spare parts strategy
    11.8 Special precautions
12 Technical documentation requirements
    12.1 Tender documentation
    12.2 Contract documentation
13 Applicable legislation, regulations, standards and
    further requirements
    13.1 Legislation and regulations
    13.2 Standards
    13.3 Further requirements
14 Evaluation criteria
    14.1 General
    14.2 Technical criteria
15 Quality measures
    15.1 General
    15.2 Approvals procedure
    15.3 Inspection requirements
    15.4 Non-conformity
16 Site factors
    16.1 Access
    16.2 Facilities
    16.3 Site specific requirements
17 Verification of specified performance
    17.1 General
    17.2 Works tests
    17.3 Tests during installation and commissioning
    17.4 Technical conditions for trial run
    17.5 Functional and performance tests
Annex A (informative) Bibliography
Annex B (informative) Degradation and ageing

Applies to open-cycle gas turbines using normal combustion systems, generally greater than 20 MW electrical output, and also includes closed-cycle, semi closed-cycle and combined-cycle gas turbine power plants and combined heat and power plants.

DocumentType
Standard
Pages
32
PublisherName
National Standards Authority of Ireland
Status
Current

Standards Relationship
EN 45510-5-2:1998 Identical
BS EN 45510-5-2:1998 Identical
DIN EN 45510-5-2:1998-06 Identical
UNE-EN 45510-5-2:1999 Identical
EN 45510-5-2 : 1998 Identical

View more information
£58.57
Excluding VAT

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.