IEC 61358:1996
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
Acceptance inspection for direct connected alternating current static watt-hour meters for active energy (Classes 1 and 2)
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
12-03-2009
English - French, Spanish, Castilian
01-05-1996
FOREWORD
INTRODUCTION
Clause
1 Scope
2 General remarks
3 Normative references
4 Definitions
5 Acceptance conditions for batches
5.1 100 % inspection
5.2 Sampling inspection
6 Place of inspection
7 Test conditions
7.1 Reference conditions
7.2 Uncertainty of measurement
7.3 Cover and seal
8 Inspection and test procedure
8.1 Preheating
8.2 Test no. 1: AC voltage test
8.3 Test no. 2: Test of no-load condition
8.4 Test no. 3: Test of starting condition
8.5 Tests nos. 4 to 9: Tests of accuracy requirements
8.6 Test no. 10: Verification of meter constant
9 Requirements corresponding to different inspection
procedures
9.1 100 % inspection
9.2 Sampling inspection
Tables
Figures
Annexes
A Symbols
B Bibliography
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.