• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

IEC TS 61400-26-1:2011

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

Wind turbines - Part 26-1: Time-based availability for wind turbine generating systems

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Superseded date

31-12-2021

Language(s)

English, Spanish, Castilian

Published date

14-11-2011

FOREWORD
1 Scope
2 Normative references
3 Terms, definitions and abbreviations
4 Information model
5 INFORMATION AVAILABLE
6 INFORMATION UNAVAILABLE
Annex A (informative) - Optional information
        categories - examples
Annex B (informative) - Time based availability
        indicators - examples
Annex C (informative) - Verification scenarios - examples
Bibliography

IEC 61400-26-1:2011(E) defines generic information categories to which fractions of time can be assigned for a wind turbine generating system (WTGS) considering internal and external conditions based on fraction of time and specifying the following:
- generic information categories of a WTGS considering availability and other performance indicators;
- information category priority in order to discriminate between concurrent categories;
- entry and exit point for each information category in order to allocate designation of time;
- informative annexes providing various examples.

DevelopmentNote
Stability Date: 2017. (09/2017)
DocumentType
Technical Specification
Pages
53
PublisherName
International Electrotechnical Committee
Status
Superseded
SupersededBy

CLC/TS 61400-26-3:2017 Wind energy generation systems - Part 26-3: Availability for wind power stations
PD ISO/TR 21245-1:2016 Railway applications. Rail project planning process Stakeholders and their needs/interests
I.S. EN 61400-25-2:2015 WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS
BS EN 61400-25-2:2015 Wind turbines Communications for monitoring and control of wind power plants - Information models
S.R. CLC/TS 61400-26-2:2017 WIND TURBINES - PART 26-2: PRODUCTION-BASED AVAILABILITY FOR WIND TURBINES
PD CLC/TS 61400-26-2:2017 Wind turbines Production-based availability for wind turbines
IEC TS 61400-26-2:2014 Wind turbines - Part 26-2: Production-based availability for wind turbines
CLC/TS 61400-26-2:2017 Wind turbines - Part 26-2: Production-based availability for wind turbines
BS PD IEC TS 61400-26-2 : 2014 WIND TURBINES - PART 26-2: PRODUCTION-BASED AVAILABILITY FOR WIND TURBINES
S.R. CLC/TS 61400-26-3:2017 WIND ENERGY GENERATION SYSTEMS - PART 26-3: AVAILABILITY FOR WIND POWER STATIONS
IEC 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
IEC TS 61400-26-3:2016 Wind energy generation systems - Part 26-3: Availability for wind power stations
PD CLC/TS 61400-26-3:2017 Wind energy generation systems Availability for wind power stations
PD IEC/TS 61400-26-3:2016 Wind energy generation systems Availability for wind power stations
NF EN 61400-25-2 : 2016 WIND TURBINES - PART 25-2: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - INFORMATION MODELS
EN 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models

IEC 60050-415:1999 International Electrotechnical Vocabulary (IEV) - Part 415: Wind turbine generator systems
IEEE 762-2006 IEEE Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity
ISO 3977-9:1999 Gas turbines Procurement Part 9: Reliability, availability, maintainability and safety
IEC 61400-25-4:2016 Wind energy generation systems - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
IEC 61400-25-3:2015 Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
IEC 61400-25-2:2015 Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
IEC 61400-1:2005+AMD1:2010 CSV Wind turbines - Part 1: Design requirements

View more information
£281.44
Excluding VAT

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.