1. SCOPE
1.1 Scope
1.2 Reports interface
2. APPLICABLE DOCUMENTS
2.1 Government documents
2.2 Non-Government publications
2.3 Order of precedence
3. DEFINITIONS
3.1 Accepted Ship Report (ASR)
3.2 Accepted Weight Estimate (AWE)
3.3 Acquisition margins
3.4 Actual weight
3.5 Allocated Baseline Weight Estimate (ABWE)
3.6 Baseline Weight Estimate (BWE)
3.7 Bidder's Independent Weight Estimate (BIWE)
3.8 Calculated weight
3.9 Capacity Load Condition (Condition E)
3.10 Category
3.11 Category system
3.12 Contract Data Requirements List (CDRL) (DD Form
1423)
3.13 Contract design margin
3.14 Contract Design Weight Estimate (CDWE)
3.15 Contract modification margin
3.16 Contract modification summary
3.17 Contractor-responsible condition
3.18 Current weight
3.19 Design and Weight Data Sheet
3.20 Detail design and building margin
3.21 Estimated weight
3.22 Expanded Ship Work Breakdown Structure (ESWBS)
3.23 Feasibility Study Weight Estimate
3.24 Final Weight Report (FWR)
3.25 Full Load Condition (Condition D)
3.26 Government-Furnished Material (GFM) margin
3.27 Government-Furnished Material summary
3.28 Group
3.29 Gyradius
3.30 Inch-pound units
3.31 Inclining experiment
3.32 KG
3.33 Light Ship Condition (Condition A)
3.34 Longitudinal lever
3.35 Magnetic media
3.36 Mass properties data
3.37 Metric units
3.38 Moment
3.39 Percent completion
3.40 Performance-type contract
3.41 Pitch moment of inertia
3.42 Preliminary Allocated Baseline Weight Estimate
(PABWE)
3.43 Preliminary design margin
3.44 Preliminary Design Weight Estimate
3.45 Quarterly Weight Report (QWR)
3.46 Roll moment of inertia
3.47 Service Life Allowances
3.48 SI units (International Systems of Units)
3.49 Specification-type contract
3.50 Standard longitudinal station breakdown
3.51 Three-digit system
3.52 Transverse lever
3.53 Vertical lever
3.54 Weight control
3.55 Weight control plan
3.56 Weight distribution
3.57 Weight moment of inertia
3.58 Weight reporting
3.59 Yaw moment of inertia
4. GENERAL REQUIREMENTS
4.1 Determination of mass properties data
4.2 General report requirements
4.3 Classified reports
5. DETAILED REQUIREMENTS
5.1 Preliminary/contract design phases
5.2 Pre-award process
5.3 Detail design and construction phase
6. NOTES
6.1 Intended use
6.2 Issue DODISS
6.3 Data requirements
6.4 Subject term (key word) listing
6.5 Changes from previous issue
FIGURES
APPENDIX INPUT DATA FILE FORMAT AND TRANSFER