• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

NOBLE 0029 : REV 1

Current

Current

The latest, up-to-date edition.

GUIDELINES FOR SUBMARINE PIPELINE INSTALLATION

Published date

08-08-2013

Publisher

Noble Denton

1 SUMMARY
2 INTRODUCTION
3 DEFINITIONS
4 THE APPROVAL PROCESS
5 PIPELINE DESIGN FOR INSTALLATION
6 PIPELINE ROUTE & SURVEY REQUIREMENTS
7 PIPE, UMBILICAL AND CABLE HANDLING
   AND TRANSPORTATION
8 INSTALLATION VESSEL AND PROCEDURE
   REQUIREMENTS
9 REQUIREMENTS FOR LAY VESSEL OPERATIONS
10 INSTALLATION OPERATIONS AND EQUIPMENT
   REQUIREMENTS
REFERENCES
APPENDIX A - INFORMATION REQUIRED FOR APPROVAL

Specifies the Guidelines on which GL Noble Denton approval of pipeline installation by laying, pulling or towing, would be based.

Committee
TS
DocumentType
Standard
PublisherName
Noble Denton
Status
Current

NOBLE 0030 : REV 6.1 GUIDELINES FOR MARINE TRANSPORTATIONS
NOBLE 0001 : REV 1.1 GENERAL GUIDELINES FOR MARINE PROJECTS
API 2RD : 2013 DYNAMIC RISERS FOR FLOATING PRODUCTION SYSTEMS
NOBLE 0013 : REV 8.1 GUIDELINES FOR LOAD-OUTS
IMCA M 117 : FEB 2006 THE TRAINING AND EXPERIENCE OF KEY DP PERSONNEL
BS EN 14164:2014 Foodstuffs. Determination of vitamin B6 by high performance chromatography
NOBLE 0027 : REV 11.2 GUIDELINES FOR MARINE LIFTING & LOWERING OPERATIONS
NOBLE 0032 : REV 2.1 GUIDELINES FOR MOORINGS
API 1111 : 2015 DESIGN, CONSTRUCTION, OPERATION, AND MAINTENANCE OF OFFSHORE HYDROCARBON PIPELINES (LIMIT STATE DESIGN)

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.