• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

PD IEC TR 62672:2018

Current

Current

The latest, up-to-date edition.

Reliability and availability evaluation of HVDC systems

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

08-10-2018

This document applies to all line-commutated and voltage-sourced high-voltage direct current
(HVDC) transmission systems used for power exchange in utility systems.

This document applies to all line-commutated and voltage-sourced high-voltage direct current (HVDC) transmission systems used for power exchange in utility systems.

In order to assess the operational performance of HVDC transmission systems, reliability and availability are evaluated. The intention of the performance evaluation is to identify further design improvements. For this purpose the HVDC users/owners are encouraged to compile reports on an annual basis based on the recommendations given in this document. The purpose of this document is to define a standardized reporting protocol so that data collected from different HVDC transmission systems can be compared on an equitable basis. Such reports can be sent to Cigré SC B4, “HVDC and Power Electronics?? (http://b4.cigre.org) which collects such data and publishes it in a survey of HVDC systems throughout the world on a biannual basis.

This document covers point-to-point transmission systems, back-to-back interconnections and multi-terminal transmission systems. For point-to-point systems and back-to-back interconnections, i.e. two-terminal systems, statistics are reported based on the total transmission capability from the sending end to the receiving end measured at a given point. If, however, the two terminals are operated by different users/owners, or are composed of equipment of a different vintage or of equipment from different suppliers, statistics can be reported on an individual station basis if so desired by those responsible for reporting. In such a case, the outage is only reported under the originating converter station, taking care not to report the same event twice. For multi-terminal systems, i.e. systems with more than two terminals, statistics are reported separately for each converter station based on its own individual capability.

Multi-terminal systems, incorporating parallel converters but having only two converter stations on the DC line, can be considered as either point-to-point systems or as multi-terminal systems for purpose of reporting. Therefore, statistics for this special type of multi-terminal system can be reported based on either total transmission capability or on individual station capability. If the converters at one station use different technology, converter station statistics can be reported separately for each different type of capacity if desired. Multiple bipoles are also reported individually. Special mention is given in the text and in the tabulations to any common events resulting in bipolar outages.

NOTE Usually the agreement between the purchaser and the turnkey suppliers of the HVDC converter station includes specific requirements regarding contractual evaluation. Such specific requirements will prevail over this document.

Committee
PEL/22
DocumentType
Standard
ISBN
9780580977541
Pages
48
ProductNote
This standard also refers to CIGRE 590:2014
PublisherName
British Standards Institution
Status
Current
Supersedes

Standards Relationship
IEC TR 62672:2018 Identical

View more information
£262.00
Excluding VAT

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.