• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

PD IEC/TS 62561-8:2018

Current

Current

The latest, up-to-date edition.

Lightning protection system components (LPSC) Requirements for components for isolated LPS

Published date

09-02-2018

This document specifies the requirements and tests for insulating stand-offs, used in conjunction with an air-termination system and down-conductors with the aim of maintaining the proper separation distance, and the requirements and tests for insulating down-conductors, including their specific fasteners, able to reduce the separation distance.

Testing of insulating stand-offs and insulating down-conductors components for an explosive atmosphere is not covered by this document.

Requirements and tests for other types of components for isolated LPS are under consideration.

Committee
GEL/81
DocumentType
Standard
PublisherName
British Standards Institution
Status
Current

Standards Relationship
IEC TS 62561-8:2018 Identical

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.