• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

PREN 459-3 : DRAFT 2009

Superseded
Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

BUILDING LIME - PART 3: CONFORMITY EVALUATION
Superseded date

01-06-2011

Published date

12-01-2013

Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Factory production control by the manufacturer
  4.1 General requirements
      4.1.1 Definition and concept
      4.1.2 Work's quality manual
      4.1.3 Management system
      4.1.4 System of documentation
  4.2 Internal quality control
      4.2.1 Process control
      4.2.2 Measuring and testing
      4.2.3 Handling, storage, packaging and delivery
  4.3 Autocontrol testing of samples
      4.3.1 Sampling and testing
      4.3.2 Evaluation of results of autocontrol testing of
            samples
      4.3.3 Corrective action
      4.3.4 Measuring and test equipment for autocontrol
            testing
      4.3.5 Quality records
  4.4 Initial type testing of the building lime
5 Other conformity evaluation tasks
  5.1 Surveillance, assessment and acceptance of the
      factory production control
      5.1.1 Inspection tasks
      5.1.2 Frequency of inspections
      5.1.3 Reports
  5.2 Initial inspection of the factory and the factory
      production control
      5.2.1 Inspection of a new factory
      5.2.2 Inspection of an existing factory
      5.2.3 Criteria for the assessment of the production
            equipment
      5.2.4 Criteria for the assessment of laboratories
6 Actions in the event of non-conformity
  6.1 Actions to be taken by the manufacturer
  6.2 Actions to be taken in case of a non-conforming
      factory production control system
7 Requirements for dispatching centres
  7.1 General
  7.2 Tasks for the intermediary
      7.2.1 Quality control
      7.2.2 Confirmation autocontrol testing of samples
            taken at the dispatching centre
Bibliography

Describes the scheme for the evaluation of conformity of building lime to their corresponding product standard EN 459-1 by the manufacturer.

Committee
TC 51
DocumentType
Draft
PublisherName
Comite Europeen de Normalisation
Status
Superseded
SupersededBy

Standards Relationship
09/30205529 DC : 0 Identical

EN 459-2:2010 Building lime - Part 2: Test methods
ISO 2854:1976 Statistical interpretation of data — Techniques of estimation and tests relating to means and variances
EN 459-1:2015 BUILDING LIME - PART 1: DEFINITIONS, SPECIFICATIONS AND CONFORMITY CRITERIA
EN 45011 : 1998 GENERAL REQUIREMENTS FOR BODIES OPERATING PRODUCT CERTIFICATION SYSTEMS

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.