• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

PREN 50518-2 : DRAFT 2008

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

MONITORING AND ALARM RECEIVING CENTRE - PART 2: REQUIREMENTS FOR TECHNICAL FACILITIES

Superseded date

01-10-2010

Published date

12-01-2013

Introduction
1 Scope
2 Normative references
3 Definitions and abbreviations
   3.1 Definitions
   3.2 Abbreviations
4 Performance requirements
5 Communication requirements
6 Reception of signals
   6.1 General requirements
   6.2 Operator actions
7 Testing
   7.1 Daily checks
   7.2 Weekly checks
   7.3 Fault procedures and reporting
8 Data
   8.1 Client data
   8.2 Data of incoming signals
   8.3 Data of ARC external communications
   8.4 Log of operator actions
9 Data storage
10 Availability and verification of performance of the ARC
11 Contingency plan
   11.1 General
   11.2 Abnormal occurrence examples

Defines the technical requirements of an ARC. It also includes functional performance criteria and verification of performance.

Committee
TC 79
DocumentType
Draft
PublisherName
European Committee for Standards - Electrical
Status
Superseded
SupersededBy

Standards Relationship
NEN EN 50518-2 : 2013 Identical
DIN EN 50518-2 : 2014 Identical
08/30183528 DC : 0 Identical
NF EN 50518-2 : 2014 Identical
VDE 0830-5-6-2 : 2014 Identical

PREN 50518-3 : DRAFT 2009 MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION
09/30183531 DC : 0 BS EN 50518-3 - MONITORING AND ALARM RECEIVING CENTRE - PART 3: PROCEDURES AND REQUIREMENTS FOR OPERATION
BS 7499:2013 Static site guarding and mobile patrol service. Code of practice

EN 50518-1:2013 MONITORING AND ALARM RECEIVING CENTRE - PART 1: LOCATION AND CONSTRUCTION REQUIREMENTS
EN 50136-1:2012 Alarm systems - Alarm transmission systems and equipment - Part 1: General requirements for alarm transmission systems
EN 50131-1:2006/A2:2017 ALARM SYSTEMS - INTRUSION AND HOLD-UP SYSTEMS - PART 1: SYSTEM REQUIREMENTS

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.