• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

UFC 4-022-03 : 2013

Current

Current

The latest, up-to-date edition.

UNIFIED FACILITIES CRITERIA - SECURITY FENCES AND GATES

Published date

26-09-2016

CHAPTER 1 - INTRODUCTION
CHAPTER 2 - FENCING
CHAPTER 3 - GATES
APPENDIX A - REFERENCES
APPENDIX B - GLOSSARY
APPENDIX C - FENCE AND GATE DESIGN DETAILS

Gives a unified approach for the design, selection, and installation of security fences and gates for Department of Defense (DoD). Pertains to all construction, renovation, and repair projects including expeditionary or temporary construction that include security fencing and gates for DoD. Consult with current Service policies, location of facility, and threat level for specific requirements.

DocumentType
Standard
PublisherName
US Military Specs/Standards/Handbooks
Status
Current
Supersedes

UFC 4-022-01 : 2017 UNIFIED FACILITIES CRITERIA - ENTRY CONTROL FACILITIES ACCESS CONTROL POINTS
FC 4-211-03F : 2016 FACILITIES CRITERIA - AIR FORCE FIGHTER ENGINE MAINTENANCE FACILITY
FC 4-721-02F : 2015 FACILITIES CRITERIA - AIR FORCE LEVEL 1 CONFINEMENT FACILITY
FC 4-740-14N : 2014 FACILITIES CRITERIA - NAVY AND MARINE CORPS CHILD DEVELOPMENT CENTERS
UFC 3-460-01 : Change 3 UNIFIED FACILITIES CRITERIA - DESIGN: PETROLEUM FUEL FACILITIES
FC 4-179-03F : 2015 FACILITIES CRITERIA - AIR FORCE INDOOR SMALL ARMS FIRING RANGE
UFC 4-021-02 : 2013 UNIFIED FACILITIES CRITERIA - ELECTRONIC SECURITY SYSTEMS
UFC 4-215-01 : 2014 UNIFIED FACILITIES CRITERIA - ARMORIES AND ARMS ROOMS
UFC 3-201-02 : Change 1 UNIFIED FACILITIES CRITERIA - LANDSCAPE ARCHITECTURE

UFC 4-020-01 : 2008 UNIFIED FACILITIES CRITERIA - DOD SECURITY ENGINEERING FACILITIES PLANNING MANUAL
ASTM F 1267 : 2015-12 SPECIFICATION FOR METAL, EXPANDED, STEEL
ASTM F 2408 : 2016 : REDLINE Standard Specification for Ornamental Fences Employing Galvanized Steel Tubular Pickets
UFC 4-010-01 : 2018 UNIFIED FACILITIES CRITERIA - DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS
ASTM F 668 : 2017 : REDLINE Standard Specification for Polyvinyl Chloride (PVC), Polyolefin and Other Polymer-Coated Steel Chain Link Fence Fabric
ASTM B 221 : 2014 : REDLINE Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
UFC 4-022-02 : Change 1 UNIFIED FACILITIES CRITERIA - SELECTION AND APPLICATION OF VEHICLE BARRIERS
ASTM A 121 : 2013 Standard Specification for Metallic-Coated Carbon Steel Barbed Wire
UFC 1-200-01 : 20071127 UNIFIED FACILITIES CRITERIA (UFC) DOD BUILDING CODE(GENERAL BUILDING REQUIREMENTS)
IEEE 80-2013 REDLINE IEEE Guide for Safety in AC Substation Grounding
ASTM A 702 : 2013-11 SPECIFICATION FOR STEEL FENCE POSTS, HOT WROUGHT
IEEE C2-2017 NATIONAL ELECTRICAL SAFETY CODE (NESC)(R)
ASTM F 2200 : 2017 : REDLINE Standard Specification for Automated Vehicular Gate Construction
ASTM F 1184 : 2016 : REDLINE Standard Specification for Industrial and Commercial Horizontal Slide Gates
ASTM F 2589 : 2016 : REDLINE Standard Specification for Ornamental Fences Employing Steel Tubular Pickets
ASTM F 1083 : 2016-02 SPECIFICATION FOR PIPE, STEEL, HOT-DIPPED ZINC-COATED (GALVANIZED) WELDED, FOR FENCE STRUCTURES
UFC 4-022-01 : 2017 UNIFIED FACILITIES CRITERIA - ENTRY CONTROL FACILITIES ACCESS CONTROL POINTS
ASTM F 1379 : 1995 : R2018 Standard Terminology Relating to Barbed Tape
UFC 4-021-02 : 2013 UNIFIED FACILITIES CRITERIA - ELECTRONIC SECURITY SYSTEMS
ASTM F 2611 : 2015 : REDLINE Standard Guide for Design and Construction of Chain Link Security Fencing
UFC 3-530-01 : Change 3 UNIFIED FACILITIES CRITERIA - INTERIOR AND EXTERIOR LIGHTING SYSTEMS AND CONTROLS

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.