• There are no items in your cart
We noticed you’re not on the correct regional site. Switch to our AMERICAS site for the best experience.
Dismiss alert

UNI EN ISO 5167-1 : 2004

Withdrawn
Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

MEASUREMENT OF FLUID FLOW BY MEANS OF PRESSURE DIFFERENTIAL DEVICES INSERTED IN CIRCULAR CROSS-SECTION CONDUITS RUNNING FULL - PART 1: GENERAL PRINCIPLES AND REQUIREMENTS
Withdrawn date

22-09-2022

Published date

01-10-2004

Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Symbols and subscripts
   4.1 Symbols
   4.2 Subscripts
5 Principle of the method of measurement and computation
   5.1 Principle of the method of measurement
   5.2 Method of determination of the diameter ratio of the
       selected standard primary device
   5.3 Computation of flowrate
   5.4 Determination of density, pressure and temperature
6 General requirements for the measurements
   6.1 Primary device
   6.2 Nature of the fluid
   6.3 Flow conditions
7 Installation requirements
   7.1 General
   7.2 Minimum upstream and downstream straight lengths
   7.3 General requirements for flow conditions at the primary
       device
   7.4 Flow conditioners (see also Annex C)
8 Uncertainties on the measurement of flow-rate
   8.1 Definition of uncertainty
   8.2 Practical computation of the uncertainty
Annex A (informative) Iterative computations
Annex B (informative) Examples of values of the pipe wall
         uniform equivalent roughness, k
Annex C (informative) Flow conditioners and flow straighteners
Bibliography

Specifies the geometry and method of use of nozzles, orifice plates and Venturi tubes and when they are inserted in a conduit running full to determine the flow rate of the fluid flowing in the conduit.

Committee
CT 55
DevelopmentNote
Supersedes CNR UNI 10023. (10/2002)
DocumentType
Standard
PublisherName
Ente Nazionale Italiano di Unificazione (UNI)
Status
Withdrawn
Supersedes

UNI 9167 : 2009 INITIAL PRESSURE AND REDUCTION PLANTS FOR NATURAL GAS - DESIGN, CONSTRUCTION AND TESTING
UNI/TS 11291-2 : 2010 GAS MEASUREMENT SYSTEMS - HOURLY BASED GAS METERING SYSTEMS - PART 2: CTE PROTOCOL
UNI TS 11291-1 : 2013 GAS MEASUREMENT SYSTEMS - HOURLY BASED GAS METERING SYSTEMS - PART 1: GENERAL REQUIREMENTS FOR REMOTE READING OR REMOTE MANAGEMENT SYSTEM

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.