• There are no items in your cart

API 96 : 2013

Current
Current

The latest, up-to-date edition.

DEEPWATER WELL DESIGN AND CONSTRUCTION
Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

03-01-2013

1 Scope
2 Normative References
3 Terms, Definitions, and Abbreviations
4 Deepwater Rig Systems and Subsea Configurations
5 Well Design Considerations
6 Special Considerations for Drilling
7 Special Considerations for Completions
8 Drilling Operations Considerations
9 Completion Operations Considerations
10 Management of Change
Annex A (informative) - Examples of Barriers Employed During
        Operations
Annex B (informative) - Example Barrier Definitions
Annex C (informative) - Examples of Inflow Testing
Bibliography

Gives engineers a reference for deepwater DW well design as well as drilling and completion operations.

DocumentType
Standard
Pages
170
ProductNote
This product is unavailable in Cuba, Iran, North Korea, Syria
PublisherName
American Petroleum Institute
Status
Current

API 92L : 2015 DRILLING AHEAD SAFELY WITH LOST CIRCULATION IN THE GULF OF MEXICO
16/30292328 DC : 0 BS ISO 27914 - CARBON DIOXIDE CAPTURE, TRANSPORTATION AND GEOLOGICAL STORAGE - GEOLOGICAL STORAGE
API 97 : 2013 WELL CONSTRUCTION INTERFACE DOCUMENT GUIDELINES
API 100-1 : 2015 HYDRAULIC FRACTURING - WELL INTEGRITY AND FRACTURE CONTAINMENT

API 10B-2 : 2013 RECOMMENDED PRACTICE FOR TESTING WELL CEMENTS
API 2A WSD : 2014 PLANNING, DESIGNING, AND CONSTRUCTING FIXED OFFSHORE PLATFORMS - WORKING STRESS DESIGN
API 10B-3 : 2016 TESTING OF WELL CEMENTS USED IN DEEPWATER WELL CONSTRUCTION
API TR 10TR1 : 2008 CEMENT SHEATH EVALUATION
API 5CT : 2012 CASING AND TUBING
API TR 6AF2 : 2013 TECHNICAL REPORT ON CAPABILITIES OF API INTEGRAL FLANGES UNDER COMBINATION OF LOADING - PHASE 2
API TR 6AF1 : 1998 TECHNICAL REPORT ON TEMPERATURE DERATING ON API FLANGES UNDER COMBINATION OF LOADING
API 6A : 2010 SPECIFICATION FOR WELLHEAD AND CHRISTMAS TREE EQUIPMENT
API 14A : 2015 SPECIFICATION FOR SUBSURFACE SAFETY VALVE EQUIPMENT
NACE TM 01 77 : 2016 LABORATORY TESTING OF METALS FOR RESISTANCE TO SULFIDE STRESS CRACKING AND STRESS CORROSION CRACKING IN H[2]S ENVIRONMENTS
API 10A : 2011 SPECIFICATION FOR CEMENTS AND MATERIALS FOR WELL CEMENTING
API 2RD : 2013 DYNAMIC RISERS FOR FLOATING PRODUCTION SYSTEMS
API 65 : 2002 CEMENTING SHALLOW WATER FLOW ZONES IN DEEPWATER WELLS
ISO 28781:2010 Petroleum and natural gas industries Drilling and production equipment Subsurface barrier valves and related equipment
API RP 16Q : 2017 DESIGN, SELECTION, OPERATION, AND MAINTENANCE OF MARINE DRILLING RISER SYSTEMS
API RP 14B : 2015 DESIGN, INSTALLATION, OPERATION, TEST, AND REDRESS OF SUBSURFACE SAFETY VALVE SYSTEMS
API 5C3 : 1994 BULLETIN ON FORMULAS AND CALCULATIONS FOR CASING, TUBING, DRILL PIPE AND LINE PIPE PROPERTIES
API SPEC 11D1 : 2015 PACKERS AND BRIDGE PLUGS
API RP 13B-2 : 2014 RECOMMENDED PRACTICE FOR FIELD TESTING OF OIL-BASED DRILLING FLUIDS
ISO 10432:2004 Petroleum and natural gas industries Downhole equipment Subsurface safety valve equipment
API 8B : 2014 RECOMMENDED PRACTICE FOR PROCEDURES FOR INSPECTIONS, MAINTENANCE, REPAIR, AND REMANUFACTURE OF HOISTING EQUIPMENT
API 2INT-DG : 2007 INTERIM GUIDANCE FOR DESIGN OF OFFSHORE STRUCTURES FOR HURRICANE CONDITIONS
API 6AF : 2008 TECHNICAL REPORT ON CAPABILITIES OF API FLANGES UNDER COMBINATIONS OF LOAD
CFR 30(PTS200-699) : JUL 2017 MINERAL RESOURCES - DEPARTMENT OF THE INTERIOR
ISO 10426-6:2008 Petroleum and natural gas industries — Cements and materials for well cementing — Part 6: Methods for determining the static gel strength of cement formulations
API 10TR4 : 2008 SELECTION OF CENTRALIZERS FOR PRIMARY CEMENTING OPERATIONS
API 53 : 2012 BLOWOUT PREVENTION EQUIPMENT SYSTEMS FOR DRILLING WELLS
API 17H : 2013 REMOTELY OPERATED TOOLS AND INTERFACES ON SUBSEA PRODUCTION SYSTEMS
API 2INT-MET : 2007 INTERIM GUIDANCE ON HURRICANE CONDITIONS IN THE GULF OF MEXICO
API 17D : 2011 DESIGN AND OPERATION OF SUBSEA PRODUCTION SYSTEMS - SUBSEA WELLHEAD AND TREE EQUIPMENT
API 5C5 : 2017 PROCEDURES FOR TESTING CASING AND TUBING CONNECTIONS
NORSOK D 010 : 2013 WELL INTEGRITY IN DRILLING AND WELL OPERATIONS
API TR 17TR3 : 2004 AN EVALUATION OF THE RISKS AND BENEFITS OF PENETRATIONS IN SUBSEA WELLHEADS BELOW THE BOP STACK
API 1111 : 2015 DESIGN, CONSTRUCTION, OPERATION, AND MAINTENANCE OF OFFSHORE HYDROCARBON PIPELINES (LIMIT STATE DESIGN)

View more information
US$204.00
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.